Three short videos, one for each mode, made in the program on real models. Every number you hear comes from the run.
Build a pumped water network from scratch: the start window, the fluid, the pumps, valves and tanks, the run, the results, three pump speeds in the Scenario Manager and the PDF report.
A ready model of a 20 km water line: a power failure trips both pumps, the column separates at the summit, then an air vessel, an air valve and a slower valve protect it.
Six wells to a central processing facility: the fluids, the run, the HP separator, the heat and material balance, one choke throttled and the Scenario Manager.
The surge, the vacuum at the summit, and the two ways Flowmax shows to stop them.
Request a free trial with the examples and the training manuals.