Case study · fire water

From the fire pump to the last nozzle.

Four fire water jobs, one tool: a plant's ring main, a deluge on a vessel, the sprinklers of a building, and the first seconds after a deluge valve opens on dry pipe. Each a Flowmax model, solved, with the numbers it gave.

Case 1 · Liquid

A plant's ring main and its fire pumps.

A plant of 420 by 260 m: a 14 in ring main round it and two 12 in cross mains with twelve sectional valves, 19 hydrants and 10 monitors, two storage tanks and the pump house, and the deluge valve, restriction orifice and cooling ring of each of four storage tanks. 268 links, every pipe its true length.

The design fire is a fire in tank T-101: its deluge open, and that of T-102 beside it; two monitors on T-101; two hydrants. Does the duty pump hold it?

Design fire, fire in T-101Flowmax
Duty pump P-FW-A (electric)803 m³/h at 120 m, 357 kW
Deluge T-101 / T-102, 24 K80 nozzles each230 / 230 m³/h
Nozzle pressure, 2.5 barg minimum3.97 to 4.02 barg
Monitors M-01, M-02 / hydrants H-12, H-13114 / 57 m³/h each
Ring main, 14 in12.4 to 12.7 barg
P-FW-B (diesel), P-JK (jockey)standing by
A 3D illustration of the plant fire water network, drawn by ProcessTool from the Flowmax results ; not a Flowmax view
The plant fire water network on the Flowmax sheet, laid out as the plot plan, with the fire pumps, deluge valves and outlets in use tabled

Above, a 3D illustration drawn by ProcessTool from the Flowmax results — Flowmax itself does not draw in 3D; below, the model on the Flowmax sheet, as the program shows it. Click to enlarge.

Case 2 · Liquid, NFPA 15

Deluge water spray on a vessel.

A horizontal drum 3.6 m across and 14.5 m long, sprayed at 10.2 L/min/m² over its 186 m²: 36 K33 nozzles on two headers above it and one beneath, three on each head, fed at mid-length from a deluge valve at grade. Drawn on the isometric sheet, the fittings at their NFPA equivalent lengths.

The question every deluge calculation asks: what pressure must the fire main give at the take-off for the remotest nozzle to get its flow?

Deluge on a drumFlowmax
Pressure needed at the take-off4.59 barg
Total flow, against 1,899 L/min required2,024 L/min, 6.6 % over
Flow a nozzle, 52.8 L/min required52.8 to 61.2 L/min
Remotest nozzleexactly its required flow
A 3D illustration of the deluge on a horizontal drum, drawn by ProcessTool from the Flowmax results ; not a Flowmax view

Above, a 3D illustration drawn from the results, not a Flowmax view; below, the model in Flowmax’s isometric mode.

The deluge on a horizontal drum on Flowmax's isometric sheet, the flow on every pipe and the pressure at every node
Case 3 · Liquid, NFPA 13

Sprinklers for a building.

A warehouse, Ordinary Hazard Group 2: 8.1 mm/min over a remote area of 139 m², twelve K80 sprinklers on three branch lines, the cross main, the riser with its alarm valve and the underground from the town main. Tees and elbows sit on the isometric sheet with their NFPA lengths.

Adjust finds the pressure at the town main that gives the most remote sprinkler exactly its flow, and the report plots the town main's flow test against the demand on Q1.85 paper, as NFPA 13 draws it.

Warehouse sprinklersFlowmax
Pressure needed at the town main3.83 barg
Sprinkler demand / with 950 L/min of hoses1,282 / 2,232 L/min
Most remote sprinkler97.2 L/min at 1.48 barg
Margin on the town main's supply curve1.11 bar
A warehouse sprinkler system on Flowmax's isometric sheet, the flow on every pipe and the pressure at every node
Case 4 · Transient

In time: dry pipe, deluge filling, water hammer.

When a deluge valve opens on dry pipe, the water takes time to reach the last nozzle, and the front that arrives there can put a pressure on the pipe that the steady state never shows. The same Flowmax model, run in the Transient mode, answers both.

Dry systems in timeFlowmax
Three deluge branches full of water8.6, 10.5 and 11.9 s
Offshore dry riser: water at the top deck33.4 s
Deluge: first and last nozzles flowing3.6 and 6.9 s
Fire cases against a 16 barg limit8 cases, one chart
The filling of three deluge branches in time, in the Transient mode
As a service

Fire water documentation, brought up to date.

Plants change and the fire water documents fall behind. ProcessTool models the network as built, runs every fire case following NFPA calculation methods, checks the fire pumps against their curves, and issues the calculation report, the line list and the nozzle layouts, with the Flowmax model so they stay up to date.

These systems are worked examples built by ProcessTool to show the method; their layouts, flows and conditions are illustrative.