Steady-State Training Manual

Twelve worked examples · Examples 1 to 12

Three pipes · Pump sizing and rating · Cooling water circuit
Chilled water · Gasoline pipeline · Fire water ring main
Tank spray systems · LNG rundown · Parallel pumps and NPSH
Sprinklers to NFPA 13 · Deluge on a drum to NFPA 15 · Fire pump and standpipes
Revision 3 – October 2026

About this manual#

This manual teaches steady-state hydraulic calculation with FlowMax by working twelve cases from start to finish. The first three are small and establish how the program is driven. The other nine are the kind of case a process, piping or fire protection engineer is actually handed. Each one is a complete project file that can be opened, run and changed.

The examples are also where the analysis tools are taught. A scenario, a goal seek, a formula, a graph or a results table on the sheet is introduced in the example where an engineer would reach for it, and is then used again in later examples without being explained twice. The analysis tools, and where each is taught lists which example introduces which tool.

Table 1 The twelve examples
ExampleCaseFlowMax features it introduces or usesThe engineering lesson
1Three pipes and a teePipes, nodes, fittings from the library, the table of the selected element, tables on the sheet, a first Sets scenarioWhere the pressure goes: friction, fittings and static head
2A pump, sized and then ratedTanks, pump sizing and rating modes, control valve, Graphs (pump against system), AdjustWhat throttling costs, and what speed control saves
3Cooling water circuitExchangers, flow control valves, Links and Nodes tables, Calculator, Sets scenarioBalancing, and the limit of a control valve
4Chilled water distributionPipe Sizing module, load cases as a scenario chosen on the Home page, Adjust on pump speedSizing by criteria, then part-load behaviour
5Gasoline transfer pipelineLibrary fluid, two pump stations, Graphs (path graph), Calculator as a scenario resultThe hydraulic profile of a line that climbs
6Fire water ring mainLooped network, pump and pipe status, five fire cases as a scenario, Adjust on a demandWhat a ring is worth, and what is lost when part of it is shut
7Spray systems on two tanksHazen-Williams, Nozzle Layout (auto layout, insert, sizing), Adjust on the supply pressureLaying out and proving a spray system
8LNG rundown lineLibrary fluid and pipe material, path graph, Calculator, scenario on the rundown rateKeeping a boiling liquid above its bubble point
9Three pumps in parallelPumps on and off as a scenario, NPSH required curve, warnings, scenario on a pipe sizeWhy one pump alone runs out, and the NPSH problem that brings
10Warehouse sprinklers, NFPA 13The isometric sheet, sprinklers by K factor, tees and elbows with NFPA equivalent lengths, Adjust, the NFPA calculation and graph of the reportIs the town main enough for the remote area
11Deluge on a horizontal drum, NFPA 15Fittings lists in Hazen-Williams, Adjust on the take-off, a restriction orifice by ISO 5167What a deluge system needs, and what it takes when given more
12Fire pump and standpipes, NFPA 20 and 14A pump in a Sets scenario of its acceptance test, a pressure-reducing valve, Calculator, Adjust on pump speedThe pump's test points, the top outlet and the bottom one

How each example is written#

Every example has the same twelve numbered parts: objective, engineering problem, model schematic, input data, model set-up, calculation procedure, reference results, interpretation, what-if investigation, comparison, engineering remarks and exercise. An example can therefore be used on its own, and the same question is always answered in the same place.

Reading the figures and the numbers#

Licence A FlowMax Lite licence solves models of up to 40 links. Every model in this manual has 33 or fewer, so all of them run on it.

Display The project files are saved with the flowsheet label size at 12, or at 10 where the model is crowded. FlowMax fits a project to the window when it is opened, so the same file looks larger or smaller on a different screen; the Scale box on the Home page changes it.

The FlowMax workspace#

This chapter is a map. It names the parts of the window and the tools on the ribbon, and says in which example each is put to work. Nothing here needs to be learned before starting Example 1; it is the place to come back to.

The window#

The FlowMax window with Example 1 solved and pipe P3 selected. (1) the ribbon, (2) the Links and Nodes label selectors, (3) the Equipment strip, (4) the flowsheet, (5) the panel at the right, on its Properties page, (6) the status bar, (7) the overview map.
Figure 1 The FlowMax window with Example 1 solved and pipe P3 selected. (1) the ribbon, (2) the Links and Nodes label selectors, (3) the Equipment strip, (4) the flowsheet, (5) the panel at the right, on its Properties page, (6) the status bar, (7) the overview map.

The ribbon pages#

The Home page. From the left: Save; Select All, Scrolling and Select Area; Zoom In, Zoom Out, Zoom Area, the Scale box and Fit; Copy and Paste, undo and redo; Setting, Units, Fluid, Reset and Run; the Scenario Case selector (reading Base Scenario); the Links and Nodes tables; Grid, 3D effect and Setting colors; Search.
Figure 2 The Home page. From the left: Save; Select All, Scrolling and Select Area; Zoom In, Zoom Out, Zoom Area, the Scale box and Fit; Copy and Paste, undo and redo; Setting, Units, Fluid, Reset and Run; the Scenario Case selector (reading Base Scenario); the Links and Nodes tables; Grid, 3D effect and Setting colors; Search.
The Equipment strip, two squares to a row, in groups with a line between two. From the top: Pipe and Pipeline. Valve and Pump; PD (a general pressure drop) and Tank; Spray and the non-return valve; the flow meter and the Exchanger. The relief valve and the air valve; the accumulator and the surge tank; Controller. Elbow and Tee; Reducer and Inline fitting. Textbox and Callout; and Table.
Figure 3 The Equipment strip, two squares to a row, in groups with a line between two. From the top: Pipe and Pipeline. Valve and Pump; PD (a general pressure drop) and Tank; Spray and the non-return valve; the flow meter and the Exchanger. The relief valve and the air valve; the accumulator and the surge tank; Controller. Elbow and Tee; Reducer and Inline fitting. Textbox and Callout; and Table.
The Tools page: Setting, Database, Calculator, Scenario, Adjust, Sizing, Graphs and Nozzle Layout.
Figure 4 The Tools page: Setting, Database, Calculator, Scenario, Adjust, Sizing, Graphs and Nozzle Layout.
The Reports page: Report, Excel, Datasheet, Screenshot and Project information.
Figure 5 The Reports page: Report, Excel, Datasheet, Screenshot and Project information.

What a model is made of#

A FlowMax model is links joined at nodes. A link is anything that carries flow and loses or gains pressure doing it: a pipe, a pump, a valve, a general pressure drop, an exchanger, a spray nozzle. A node is a point where links meet, and is where pressure is reported.

A network can be solved only if enough is known at its edges, and the rule is the same in every hydraulic program:

Four ways to read results#

Table 2 Where results are read
WhereWhat it givesFirst used
Labels on the sheetOne or two values beside every link and node, chosen in the Links and Nodes selectorsExample 1
The table of the selected elementEvery input and result of one elementExample 1
A table on the sheet (Table, on the Equipment strip)Chosen results of chosen elements, kept on the drawing and updated by every run and by every case selectedExample 1
Links table and Nodes table (Home page)Every element of one kind, one row eachExample 3

The analysis tools, and where each is taught#

Table 3 The tools on the Tools page and the Equipment strip used in this manual
ToolWhat it doesIntroducedUsed again
Scenario (Sets)Runs the model for a list of cases, each a set of typed input values, and tabulates chosen results. With Enable case selection ticked, a case can then be chosen on the Home page and the whole sheet shows it.Example 13, 4, 5, 6, 8, 9, 12
AdjustGoal seek: varies one input until one result reaches a target value.Example 24, 6, 7, 10, 11, 12
GraphsA pump against the system it works into, or any result along a path of links.Example 25, 8, 9
CalculatorNamed formulas in the model's own results, recalculated by every run.Example 35, 6, 7, 8, 9, 10, 11, 12
Table (Equipment strip)A results table drawn on the flowsheet.Example 1all
SizingChooses pipe sizes from a schedule to meet velocity and friction limits.Example 4
Nozzle LayoutLays out spray nozzles on a tank, then inserts the nozzles and their sized pipework into the model.Example 7
Fittings & Pipe LossesElbows, tees and valves chosen from the library for one pipe; equivalent lengths in a Hazen-Williams project.Example 14, 5, 6, 8, 9, 10, 11, 12
Drawing mode (right-click on the sheet)The isometric sheet: nodes on a lattice of 30 degree lines.Example 1011, 12
Report, NFPA 13 / 15 calculationThe calculation in NFPA's form in the PDF report, with the water supply against the demand.Example 1011

Base scenario The tools that change the model - Scenario, Adjust, Sizing - work on the base case. If the case selector on the Home page shows a case, set it back to Base Scenario first; the program says so if it is forgotten.

Example 1 Three pipes and a tee#

Project file 01_3 Pipes.flmx

1.1 Objective#

To build the smallest network whose answer cannot be seen by inspection, run it, and read the result four ways. By the end the reader will be able to enter pipes, nodes and fittings, say where pressure and flow are known, read the result from the sheet, from the table of the selected element and from a table placed on the sheet, and run a first scenario.

1.2 Engineering problem#

A supply main at a known pressure feeds a tee. One branch runs to a consumer at grade; the other runs further, to a consumer nine metres up, through an elbow, an isolating gate valve and a ball check valve. Both consumers take a fixed flow. What pressure is left at each of them?

The flows are given, so they are arithmetic. What is not given is the pressure that arrives, and that is made up of three costs that behave differently: friction and fittings, which go as the square of the flow, and static head, which does not depend on flow at all.

1.3 Model schematic#

Example 1 as drawn. Names are above the pipes and nodes; the figure under each node is its elevation in metres. N1 carries the pressure symbol, N3 and N4 the demand symbol.
Figure 6 Example 1 as drawn. Names are above the pipes and nodes; the figure under each node is its elevation in metres. N1 carries the pressure symbol, N3 and N4 the demand symbol.

1.4 Input data#

Table 4 Example 1, input data
ItemValueBasis
FluidWater at 25 °CFluid library: 996.89 kg/m³, 0.89 cP
Unitsm³/h, bar (absolute), mUnit set of the project
N1, supply12.00 bar at gradeKnown pressure
N3, consumer22.00 m³/h at gradeKnown flow out, entered as Flow In = -22
N4, consumer90.00 m³/h at 9.00 mKnown flow out, entered as Flow In = -90
P1, supply main50.00 m, 100 mm boreCommercial steel, roughness 0.0457 mm
P2, branch to N350.00 m, 100 mm bore
P3, branch to N478.00 m, 100 mm boreFittings: 1 x 90° standard elbow, 1 x open gate valve, 1 x ball check valve

1.5 Model set-up#

The fluid. Press Fluid Properties on the Home page. Water is chosen from the library and its temperature typed; density, viscosity and vapour pressure follow.

Fluid Properties. (1) the fluid, from the library; (2) its temperature.
Figure 7 Fluid Properties. (1) the fluid, from the library; (2) its temperature.

The pipes. Double-click P3. Its bore is typed rather than taken from a schedule, which FlowMax allows; a schedule is the normal choice on a real job and is used from Example 2 onwards.

P3. (1) length, (2) inside diameter, (3) the fittings K factor, which here is not typed but comes from the fittings chosen in Figure 9.
Figure 8 P3. (1) length, (2) inside diameter, (3) the fittings K factor, which here is not typed but comes from the fittings chosen in Figure 9.

The fittings. The loss in bends and valves is not entered as a number. Press Details Fittings in the pipe window to open Fittings & Pipe Losses, choose each fitting in the upper list and press Add; the quantity can be typed in the lower list. FlowMax keeps the list with the pipe and writes the total into the K factor. (Ticking Specify instead lets a K be typed directly.)

Fittings & Pipe Losses for P3: one standard elbow (K 0.75), one open gate valve (0.17) and one ball check valve (70.00), total 70.92.
Figure 9 Fittings & Pipe Losses for P3: one standard elbow (K 0.75), one open gate valve (0.17) and one ball check valve (70.00), total 70.92.

The ball check valve is by far the largest resistance in the model. At 90 m³/h the velocity in P3 is 3.18 m/s and one velocity head is 0.0505 bar, so the check valve alone costs 3.54 bar. The what-if in section 1.9 asks what a different valve would cost.

The nodes. A node is told what is known about it. N1 is given a pressure; N3 and N4 are given flows. A flow leaving the network is negative.

N1, the supply: (1) the pressure is what is known here.
Figure 10 N1, the supply: (1) the pressure is what is known here.
N4, a consumer: (1) the flow is what is known, and it is negative because it leaves; (2) the node is nine metres up.
Figure 11 N4, a consumer: (1) the flow is what is known, and it is negative because it leaves; (2) the node is nine metres up.

Enough is known One pressure and two flows. The supply flow at N1 does not have to be given: it is whatever the two demands add up to.

1.6 Calculation procedure#

  1. Open 01_3 Pipes.flmx, or build the model from Table 4.
  2. Press Run on the Home page. The status bar changes to Solved.
  3. In the Links selector at the top right choose Flowrate for the upper label, and in the Nodes selector choose Pressure. The sheet now carries the results.
  4. Click P3. Its table opens at the right of the window (Figure 14).
  5. To put results on the drawing itself, press Table on the Equipment strip and click where the table is to stand. In the Add Table window (Figure 12) choose the kind of element at the top right, move the elements wanted to the right-hand list with >, do the same for the variables, give the table a title and press Add.
Add Table. The elements chosen become the columns of the table and the variables its rows.
Figure 12 Add Table. The elements chosen become the columns of the table and the variables its rows.

1.7 Reference results#

Example 1 solved. Flow in m³/h above each pipe, pressure in bar above each node, and the two tables placed on the sheet with Table, from the Equipment strip.
Figure 13 Example 1 solved. Flow in m³/h above each pipe, pressure in bar above each node, and the two tables placed on the sheet with Table, from the Equipment strip.
The table of the selected element, for P3: its inputs, and under Results its flow, pressure drop, static head loss, friction loss and velocity.
Figure 14 The table of the selected element, for P3: its inputs, and under Results its flow, pressure drop, static head loss, friction loss and velocity.

The values to check a model against are in the two tables on the sheet: N2 11.31 bar, N3 11.28 bar and N4 6.15 bar; pressure drops of 0.69, 0.03 and 5.17 bar in P1, P2 and P3.

1.8 Interpretation#

The supply carries 112.00 m³/h, the two demands added together. The two consumers, fed from the same tee, are 5.13 bar apart. The table of P3 says why: of its 5.17 bar, 0.88 bar is static head for the nine metre rise and 4.29 bar is friction and fittings together - of which the fittings are 3.58 bar and the 78 m of pipe only 0.70 bar.

The branch that costs the most is therefore not the one carrying the most flow: P1 carries 112 m³/h and loses 0.69 bar. And most of what P3 loses would not be recovered by a larger pipe.

1.9 What-if investigation#

What would a different check valve be worth? The library gives a swing check valve a K of 2.00 against 70.00 for the ball check, so the fittings total would be 2.92; with no check valve at all it would be 0.92. Rather than editing the pipe three times, the three values are run as a scenario.

  1. Press Scenario on the Tools page. The Scenario Manager opens (Figure 15); Add scenario makes a new page. Leave Scenario type at Sets.
  2. Press Select variable, and in the window that opens choose the pipe P3 and its Fitting K value and move it across with >. Close it with Select variables.
  3. Press Add variable under Output variables and choose, the same way, the pressure drop of P3 and the pressures of N2 and N4.
  4. Press Add case three times: each press adds a row to the Results table, starting from the value the model has. Type the K value of each case in the blue cells - 70.92, 2.92 and 0.92 - and press Run.
  5. Tick Enable case selection and close the window.
The Scenario Manager with the three cases run. Blue cells are typed; the others are results. Current value is the model as it stands.
Figure 15 The Scenario Manager with the three cases run. Blue cells are typed; the others are results. Current value is the model as it stands.

Duplicate copies the selected case and Remove case takes it away. A case is given a name by typing over case1 in the first column; the case selector of the Home page then lists it by that name. Apply to model writes the inputs of the selected case into the model, which then is that case: it asks first, and the results on the sheet are cleared until the next Run.

1.10 Comparison#

The Results table of Figure 15 is the comparison: N4 has 6.15 bar with the ball check valve, 9.58 bar with a swing check and 9.68 bar with none. The choice of check valve is worth 3.43 bar at the consumer; removing it altogether adds only another 0.10 bar.

Because case selection is enabled, the cases can also be looked at on the sheet. The selector at the left of the Home page now lists Base Scenario, Case-1, Case-2 and Case-3. Choose Case-2 and everything on the sheet - labels, the table of the selected element and both tables - shows that case.

The Home page with Case-2 chosen in the case selector.
Figure 16 The Home page with Case-2 chosen in the case selector.
The sheet showing Case-2, the swing check valve: the table on the sheet gives a fittings K of 2.92 for P3 and 9.58 bar at N4. FlowMax colours the elements while a case is shown.
Figure 17 The sheet showing Case-2, the swing check valve: the table on the sheet gives a fittings K of 2.92 for P3 and 9.58 bar at N4. FlowMax colours the elements while a case is shown.

1.11 Engineering remarks#

1.12 Exercise#

The consumer at N4 needs at least 8.00 bar. With the ball check valve kept, find the largest flow N4 can take. Add a second scenario page with the Flow In of N4 as the input and the pressure of N4 as the output, try -60, -70 and -80 m³/h, and narrow it down. (The answer is 70.59 m³/h. Example 2 introduces Adjust, which finds such a value directly.)

Example 2 A pump, sized and then rated#

Project files 02_Pump Sizing part 1.flmx 02_Pump Rating part 2.flmx 02_Pump Rating part 3 (speed control).flmx

2.1 Objective#

To find the head a pump must produce for a duty, then to put a real pump curve into the same model and find what that pump delivers, what its control valve has to destroy, and what speed control would save. The example introduces tanks, the two pump calculation modes, the control valve, the Graphs tool and the Adjust tool.

2.2 Engineering problem#

Water is to be transferred at 100 m³/h from an open tank at grade to a vessel held at 8 bar, five metres up, through 200 m of 6 inch pipe and a control valve. No pump has been bought yet. The first question is what the pump must do; the second, once a pump has been chosen from a catalogue, is how the installation then behaves.

2.3 Model schematic#

Example 2. Names above, nominal pipe size in inches under each pipe, elevation in metres under each node. The same drawing serves all three files.
Figure 18 Example 2. Names above, nominal pipe size in inches under each pipe, elevation in metres under each node. The same drawing serves all three files.

2.4 Input data#

Table 5 Example 2, input data
ItemValueBasis
FluidWater at 25 °CFluid library
Unitsm³/h, bar (absolute), mUnit set of the project
Tank2, suctionOpen to atmosphere, 1.01 bar, at gradeKnown pressure
Tank1, delivery8.00 bar on the surface; base at 5.00 m, level 5.00 mKnown pressure
P1 to P450.00 m each, 6 inch schedule 40Commercial steel
Pump1, part 1Sizing mode, flow 100.00 m³/hThe duty asked for
Valve1, part 1Control target Pressure drop, 1.00 barMargin allowed for control
Pump1, parts 2 and 3Rating mode, curve through 100 m³/h at 100 mCatalogue pump
Valve1, part 2Control target Flowrate, 100.00 m³/hFlow controller
Valve1, part 3Control target None, opening 100 %Valve left wide open

2.5 Model set-up#

Tank1, the delivery vessel. (1) elevation of its base, (2) liquid level, (3) the pressure on the surface. A tank is how a known pressure is given to a model.
Figure 19 Tank1, the delivery vessel. (1) elevation of its base, (2) liquid level, (3) the pressure on the surface. A tank is how a known pressure is given to a model.

Part 1, sizing. With no curve there is no duty point to find, so the question is turned round: the pump is told the flow and FlowMax reports the head that flow needs. The valve is told to lose one bar, which is the control margin being bought deliberately.

Pump1 in part 1. (1) Sizing mode; (2) the flow asked for.
Figure 20 Pump1 in part 1. (1) Sizing mode; (2) the flow asked for.
Valve1 in part 1. (1) the control target is Pressure drop, (2) one bar.
Figure 21 Valve1 in part 1. (1) the control target is Pressure drop, (2) one bar.

Part 2, rating. The pump is given the curve of the machine chosen. Press Enter data in the pump window to type the curve points. The valve stops being a stated loss and becomes a flow controller: the drop it needs is now a result.

Pump1 in part 2. (1) Rating mode, on the curve plotted at the right; (2) the efficiency at the duty point.
Figure 22 Pump1 in part 2. (1) Rating mode, on the curve plotted at the right; (2) the efficiency at the duty point.
Valve1 in part 2. (1) control target Flowrate, (2) 100 m³/h; (3) the opening is a result.
Figure 23 Valve1 in part 2. (1) control target Flowrate, (2) 100 m³/h; (3) the opening is a result.

2.6 Calculation procedure#

  1. Open 02_Pump Sizing part 1.flmx and press Run. Read the head required from the table on the sheet or by clicking the pump.
  2. Open 02_Pump Rating part 2.flmx and press Run. Compare.
  3. On the Tools page press Graphs. The file holds one graph of type Pump-system curve for Pump1; Generate draws it. To make one from nothing: Add Graph, set Graph type to Pump-system curve, press Select pump, choose the pump, Generate.
  4. Open 02_Pump Rating part 3 (speed control).flmx for the what-if of section 2.9.

2.7 Reference results#

Part 1 solved: the pump must produce 94.21 m to deliver 100 m³/h with one bar across the valve.
Figure 24 Part 1 solved: the pump must produce 94.21 m to deliver 100 m³/h with one bar across the valve.
Part 2 solved: the catalogue pump delivers 100 m³/h at 100.00 m, and the valve takes 1.57 bar at 40 per cent open.
Figure 25 Part 2 solved: the catalogue pump delivers 100 m³/h at 100.00 m, and the valve takes 1.57 bar at 40 per cent open.
The table of the selected element for Pump1 in part 2.
Figure 26 The table of the selected element for Pump1 in part 2.
Graphs, type Pump-system curve, for part 2. The system curve includes the control valve at the opening it has settled at, so the two curves cross at the controlled flow.
Figure 27 Graphs, type Pump-system curve, for part 2. The system curve includes the control valve at the opening it has settled at, so the two curves cross at the controlled flow.

2.8 Interpretation#

Sizing asked for 94.21 m. No catalogue pump has exactly that, and the one chosen gives 100.00 m at the duty flow. The extra 5.79 m does not disappear: the flow is held at 100 m³/h, so the control valve has to absorb it, and its drop goes from the 1.00 bar that was planned to 1.57 bar. The shaft power is 36.22 kW at an efficiency of 75.0 per cent; the 25.59 kW reported in part 1 is hydraulic power only, because a pump with no curve has no efficiency.

NPSH available at the pump is 9.40 m, which is ample: the suction tank is open and the suction line short. Example 9 is the example where it is not.

2.9 What-if investigation#

What does the control valve cost, and what would a variable-speed drive save? In the third file the valve is left wide open. Run it: with nothing to hold it back the pump moves out along its curve to 120.41 m³/h. The pump-system curve shows the new crossing.

The pump-system curve with the valve wide open: the curves cross at 120 m³/h.
Figure 28 The pump-system curve with the valve wide open: the curves cross at 120 m³/h.

The duty is still 100 m³/h. The speed that gives it is found with Adjust, which varies one input until one result reaches a target.

  1. Press Adjust on the Tools page, then Add Adjust.
  2. Under Adjusted variable press Select variable and choose Pump1, Relative speed.
  3. Under Target press Select variable and choose Pump1, Flowrate. Type 100 as the Target value.
  4. Press Start. The iterations are listed as they are made.
  5. Press Apply Solution to write the speed found into the pump.
Adjust: the pump speed that gives 100 m³/h with the valve wide open, found in 3 iterations.
Figure 29 Adjust: the pump speed that gives 100 m³/h with the valve wide open, found in 3 iterations.

2.10 Comparison#

Table 6 Throttling against speed control, both at 100 m³/h
Throttled, full speedValve open, speed 0.945
Relative speed1.0000.945
Pump head (m)100.0086.55
Valve pressure drop (bar)1.570.25
Shaft power (kW)36.2231.41

At 94.5 per cent speed the pump delivers the same 100 m³/h with the valve open, and the shaft power falls from 36.22 to 31.41 kW: 4.82 kW, or 13 per cent, is what the throttled valve was costing.

2.11 Engineering remarks#

2.12 Exercise#

The delivery vessel is to be operated at 9 bar instead of 8. In part 2, change the Tank pressure of Tank1 and run. Does the valve still control - is its opening below 100 per cent - and what is its pressure drop now? Then use Adjust to find the vessel pressure at which the valve is left with 0.50 bar (adjusted variable: Tank1, Tank pressure; target: Valve1, Pressure drop; target value 0.5). The answer is 9.07 bar.

Example 3 A cooling water circuit#

Project files 03_Cooling Water part1.flmx 03_Cooling Water part2 (control valve).flmx

3.1 Objective#

To model a closed circuit serving four heat exchangers, to see how unevenly it shares the flow when nothing controls it, and to balance it with flow control valves. The example introduces the Exchanger, the Links table and Nodes table, the Calculator, and uses a scenario to find where a control valve runs out.

3.2 Engineering problem#

One pump circulates cooling water from a tank, through a supply header that reduces in size as it sheds flow, to four exchangers with design duties of 50, 25, 30 and 10 m³/h, and back to the same tank through a return header. Each exchanger loses 1 bar at its design flow. Does each one get its flow?

3.3 Model schematic#

Example 3, part 1. Names above, nominal sizes under the pipes. Part 2 adds a control valve after each exchanger.
Figure 30 Example 3, part 1. Names above, nominal sizes under the pipes. Part 2 adds a control valve after each exchanger.

3.4 Input data#

Table 7 Example 3, input data
ItemValueBasis
FluidWater at 25 °CFluid library
Unitsm³/h, barg, mGauge pressure, so an open tank reads zero
Tank1Open, base at 20.00 m, level 1.00 mThe only known pressure
Pump1Rating mode; curve through 150 m³/h at 34 m
E1 to E41.00 bar at 50, 25, 30 and 10 m³/h; Required flow the sameExchanger data sheets (reference flow and reference pressure drop); the design duty
Headers6 inch; 200 m from the pump, 10 m between branchesSchedule 40
Branches4, 3, 3 and 2 inch, 10 m each waySchedule 40
Valve1 to Valve4, part 2Control target Flowrate, set to the design duty

3.5 Model set-up#

A heat exchanger is not a pipe. It is entered as an Exchanger, the button after the flow meter on the Equipment strip, by one point from its data sheet: a reference flow and the pressure drop at that flow. FlowMax scales the drop with the square of the flow, as for a PD element. The Required flow is the flow the exchanger is designed for; it is optional, and when it is given FlowMax reports how far the flow found is above it, as Overdesign. The Heat Transfer tab is used only when the fluid has variable properties.

E1, the first exchanger. (1) reference flow, (2) reference pressure drop, (3) required flow.
Figure 31 E1, the first exchanger. (1) reference flow, (2) reference pressure drop, (3) required flow.
Pump1 with its curve. (1) Rating mode; (2) efficiency at the duty point.
Figure 32 Pump1 with its curve. (1) Rating mode; (2) efficiency at the duty point.

A closed circuit has no source and no sink. The tank is the only boundary, and the pump moves what is already in it.

3.6 Calculation procedure#

  1. Open 03_Cooling Water part1.flmx and press Run.
  2. Press Links table on the Home page. Choose the kind of element in the box at its top left; every element of that kind is listed, one row each (Figure 33). Nodes table does the same for nodes.
  3. Press Calculator on the Tools page (Figure 35). To make a calculation from nothing: Add variable, choose the elements and results wanted, which become var1, var2 and so on; then type a Name and a formula in those variables and press Add. The formula turns green when it can be worked out.
  4. Open 03_Cooling Water part2 (control valve).flmx, run it, and open the Calculator again.

The Exchanger tab of the Links table lists the four exchangers with their Required flow and their Overdesign, the per cent by which the flow found is above the required one.

3.7 Reference results#

Part 1 solved, no control. Flows in m³/h, pressures in barg, and the Balance table placed on the sheet from the Calculator.
Figure 34 Part 1 solved, no control. Flows in m³/h, pressures in barg, and the Balance table placed on the sheet from the Calculator.
The Calculator for part 1. The variables are the four exchanger flows and the pump power; each calculation is a formula in them.
Figure 35 The Calculator for part 1. The variables are the four exchanger flows and the pump power; each calculation is a formula in them.
Part 2 solved, with a flow control valve after each exchanger.
Figure 36 Part 2 solved, with a flow control valve after each exchanger.

3.8 Interpretation#

With nothing to control it the circuit takes 152.05 m³/h against a design total of 115. The Calculator says how it is shared: every exchanger is between 31 and 33 per cent over its design flow. The pump was selected with margin, the exchangers are the only real resistance, and the margin becomes flow.

With the valves in, every exchanger has its design flow and the pump moves back up its curve to 37.50 m. The four valves take about 1.76 bar each at about 50 per cent open. The shaft power falls from 18.63 to 16.55 kW because less water is moved, but the power per 100 m³/h delivered rises from 12.25 to 14.39 kW: balancing by throttling is paid for in head.

3.9 What-if investigation#

The first exchanger is to be uprated. How much more flow can its valve give it before the valve is wide open? In part 2 a scenario of type Sets raises the set point of Valve1 from 50 to 80 m³/h in four cases and records the valve's opening and pressure drop.

The Scenario Manager for part 2: the set point of Valve1 as the input.
Figure 37 The Scenario Manager for part 2: the set point of Valve1 as the input.
The Results table of the scenario in full.
Figure 38 The Results table of the scenario in full.

3.10 Comparison#

At 60 m³/h Valve1 is 77 per cent open with 1.06 bar across it: it still controls. At 70 m³/h the table shows an opening of 182 per cent. An opening above 100 is FlowMax saying that the valve would have to be larger than it is to pass that flow: the duty is beyond this circuit, and the run is flagged with a warning. At 80 m³/h the pressure drop reported is negative, which is not a result at all but the sign that the case has no solution. The limit lies between 60 and 70 m³/h.

3.11 Engineering remarks#

3.12 Exercise#

Add a calculation to part 2 for the hydraulic power destroyed in the four control valves. The power lost in a valve in kW is its flow in m³/h times its pressure drop in bar, divided by 36. Add the four valve flows and pressure drops as variables and write the formula. What fraction of the pump's shaft power is being thrown away in the valves?

Example 4 Chilled water distribution#

Project files 04_Chilled Water - before sizing.flmx 04_Chilled Water.flmx 04_Chilled Water - normal load.flmx

4.1 Objective#

To size the pipework of a closed chilled water circuit with the Sizing tool, to examine the sized circuit at three load cases held in one file as a scenario and chosen from the Home page, and to find with Adjust the pump speed the circuit actually needs at normal load.

4.2 Engineering problem#

A four-storey building is served by two chillers in parallel and one circulating pump. A supply riser feeds one air handling unit on each floor; each unit has a cooling coil and a two-way control valve; a return riser brings the water back to the pump. An expansion vessel on the pump suction holds the system pressure.

What pipe sizes satisfy the project's velocity and friction limits? With those sizes, does the pump deliver the design flow to every floor? And at 60 per cent of the cooling load, where the building spends most of the year, how much of the pump's head is being thrown away in the control valves?

4.3 Model schematic#

Example 4, the sized model. Nominal size in inches above each pipe, elevation in metres above each node.
Figure 39 Example 4, the sized model. Nominal size in inches above each pipe, elevation in metres above each node.

4.4 Input data#

Table 8 Example 4, fluid, boundary and equipment
ItemValueBasis
FluidWater, Variable propertiesFluid library; 7 °C from the chillers, 13 °C from the coils, each pipe at its own temperature
Unitsm³/h, barg, mUnit set of the project
EV-1, expansion vessel3.00 barg on 1.00 m of waterAssumed fill pressure
CHWP-1Rating mode; curve through 140 m³/h at 17.6 mShut-off 22.0 m, best efficiency 78 %
CH-1, CH-2PD, 0.45 bar at 70 m³/h each; outlet temperature 7 °CChiller data sheet
AHU-1 to AHU-4PD, 0.35 bar at design flow; outlet temperature 13 °CCoil data sheet
TCV-1 to TCV-4Control target FlowrateCv twice that needed at design flow and 0.35 bar
Table 9 Air handling units
UnitFloor level (m)Design flow (m³/h)Normal load, 60 % (m³/h)
AHU-14.0050.0030.00
AHU-28.0040.0024.00
AHU-312.0030.0018.00
AHU-416.0020.0012.00
Total140.0084.00
Table 10 Pipe lengths and fittings
PipesServiceLength each (m)Fittings from the library
P1 to P4Chiller connections8.00none
S-1Supply main to the first floor35.004 x 90° standard elbow
S-2 to S-4, R-1 to R-4Risers between floors4.00none
B1a to B4bBranch to and from each unit15.001 x branching tee, 2 x 90° standard elbow, 1 x open gate valve
R-0Return main back to the pump45.004 x 90° standard elbow, 1 x open gate valve

Sizing criteria Velocity not above 2.50 m/s and friction loss not above 0.004 bar/m (400 Pa/m), schedule 40 steel. These are the limits assumed for this example; a real project takes them from its own design basis.

4.5 Model set-up#

The model is first built with every pipe at 6 inch. Nothing about that guess matters except that the model solves: the control valves fix the flow in every branch, so the flows the sizing needs are right whatever the pipes are.

The model before sizing: every pipe at 6 inch.
Figure 40 The model before sizing: every pipe at 6 inch.
EV-1, the expansion vessel: (1) elevation of its base, (2) liquid level, (3) the pressure on the surface. It is the only known pressure in the model, as the vessel is the only fixed pressure in the building.
Figure 41 EV-1, the expansion vessel: (1) elevation of its base, (2) liquid level, (3) the pressure on the surface. It is the only known pressure in the model, as the vessel is the only fixed pressure in the building.
CHWP-1. (1) Rating mode; (2) relative speed, which the scenario and the Adjust both change; (3) efficiency at the duty point.
Figure 42 CHWP-1. (1) Rating mode; (2) relative speed, which the scenario and the Adjust both change; (3) efficiency at the duty point.
AHU-1, a cooling coil as a PD element: (1) reference flow, (2) reference pressure drop.
Figure 43 AHU-1, a cooling coil as a PD element: (1) reference flow, (2) reference pressure drop.
TCV-1. (1) control target Flowrate, (2) the unit's design flow; (3) the opening is a result.
Figure 44 TCV-1. (1) control target Flowrate, (2) the unit's design flow; (3) the opening is a result.

The water is given at its temperature. In the Fluid window Variable properties is chosen, the fluid water from the library. Each chiller and each coil is an exchanger: on the Heat Transfer tab of CH-1 and CH-2 the outlet temperature is 7 °C, on each coil's 13 °C, and the expansion vessel's water is at 13 °C. The Run carries the temperatures round the circuit and takes the density and the viscosity of each pipe at its own temperature; the duties are results.

The branches carry their fittings as fittings, not as a number: the tee off the riser, two elbows and an isolating gate valve on each.

B1a, the branch to the first unit. (1) length, (2) schedule, (3) nominal diameter, (4) the fittings K factor, which is the total of Figure 46.
Figure 45 B1a, the branch to the first unit. (1) length, (2) schedule, (3) nominal diameter, (4) the fittings K factor, which is the total of Figure 46.
Fittings & Pipe Losses for B1a.
Figure 46 Fittings & Pipe Losses for B1a.

4.6 Calculation procedure#

  1. Open 04_Chilled Water - before sizing.flmx and press Run.
  2. On the Tools page press Sizing. The Pipe sizing window opens on its Set up tab (Figure 47). Leave Sizing Method at Simple.
  3. Press Select under Pipes set and choose every pipe; press Select under Diameter set and choose schedule 40.
  4. In the Constraints table leave Object at All pipes and type the allowable Velocity, 2.5, and the allowable Friction loss/Length, 0.004.
  5. Press Autosize and read the Results tab (Figure 48).
  6. Press Apply to write the chosen sizes into the model, then Run again.
  7. 04_Chilled Water.flmx is that model, sized, with the load cases of section 4.9 added.
Pipe sizing, Set up: the pipes to be sized, the candidate diameters with their cost per metre, and the constraints.
Figure 47 Pipe sizing, Set up: the pipes to be sized, the candidate diameters with their cost per metre, and the constraints.
Pipe sizing, Results: the size chosen for each pipe, the velocity and friction that result, and the total cost from the schedule library.
Figure 48 Pipe sizing, Results: the size chosen for each pipe, the velocity and friction that result, and the total cost from the schedule library.

4.7 Reference results#

The supply main S-1 comes out at 8 inch and the return main R-0 at 6 inch. The branches come to 6 inch on the lowest floor and 3 inch on the top floor, and the upper riser to 4 and 3 inch.

Peak load with the sized pipework. Flows in m³/h, pressures in barg; the two tables on the sheet give the control valves and the pump.
Figure 49 Peak load with the sized pipework. Flows in m³/h, pressures in barg; the two tables on the sheet give the control valves and the pump.
The table of the selected element for CHWP-1 at peak load.
Figure 50 The table of the selected element for CHWP-1 at peak load.

4.8 Interpretation#

Every unit receives its design flow and every control valve settles between 36 and 40 per cent open with 0.55 to 0.66 bar across it, against 0.35 bar for its coil: every valve has authority. Before sizing the same valves dropped 0.55 to 0.56 bar; the smaller pipes take some of the pump head and the valves give it up, which is exactly what sizing to a friction limit should do.

At peak load the four coils take 977 kW from the water and the two chillers take out 977 kW: the water leaves the chillers at 7 °C and comes back from the coils at 13 °C.

The static pressure is the other thing to read. The vessel holds 3.10 barg at the pump suction; the lowest pressure in the circuit is 1.74 barg at R4, on the return side of the top floor, and must stay comfortably positive or air is drawn in at the vents. The highest is the pump discharge at 4.83 barg, which is what the pressure rating has to cover.

4.9 What-if investigation#

The three load cases are not three files. They are one scenario of type Sets in 04_Chilled Water.flmx, with five inputs - the four valve set points and the pump's relative speed - and three cases: peak load, normal load at 60 per cent, and normal load with the pump slowed to 80 per cent.

The Scenario Manager with the three load cases. Enable case selection is ticked.
Figure 51 The Scenario Manager with the three load cases. Enable case selection is ticked.
The Results table of the load cases in full. Part 1 of 2; the first column is repeated.
Figure 52 The Results table of the load cases in full. Part 1 of 2; the first column is repeated.
The Results table of the load cases in full. Part 2 of 2; the first column is repeated.
Figure 53 The Results table of the load cases in full. Part 2 of 2; the first column is repeated.

With case selection enabled the cases are chosen on the Home page.

The case selector on the Home page, at Base Scenario.
Figure 54 The case selector on the Home page, at Base Scenario.
Case-2 chosen: normal load at full pump speed. The tables on the sheet follow the case.
Figure 55 Case-2 chosen: normal load at full pump speed. The tables on the sheet follow the case.
Case-3 chosen: normal load with the pump at 80 per cent speed.
Figure 56 Case-3 chosen: normal load with the pump at 80 per cent speed.
The table of the selected element for CHWP-1 with Case-3 chosen.
Figure 57 The table of the selected element for CHWP-1 with Case-3 chosen.

4.10 Comparison#

The Results table is the comparison. At normal load and full speed the pump rides back up its curve to 20.42 m. The circuit needs less head at the lower flow, not more, so the valves have to destroy the difference: the drop across TCV-4 rises from 0.55 to 1.57 bar and it closes to 14 per cent open. At 80 per cent speed the valves open again to 20 per cent and the shaft power falls from 7.30 to 4.47 kW for exactly the same cooling.

Eighty per cent was a guess. The speed the circuit needs is the one that leaves the least-favoured control valve with just enough pressure drop to control, taken here as 0.35 bar, the same as its coil. 04_Chilled Water - normal load.flmx is the sized model with the valves set to normal load, and in it an Adjust finds that speed: the adjusted variable is the relative speed of CHWP-1, the target is the pressure drop of TCV-1, the valve with the least across it, and the target value is 0.35.

Choosing the adjusted variable: the element in the left list, its variable in the middle, Select variable to confirm.
Figure 58 Choosing the adjusted variable: the element in the left list, its variable in the middle, Select variable to confirm.
Adjust at normal load: the pump speed that leaves TCV-1 with 0.35 bar.
Figure 59 Adjust at normal load: the pump speed that leaves TCV-1 with 0.35 bar.
Table 11 Normal load: full speed against the speed found by Adjust
Full speedSpeed 0.659
Pump head (m)20.427.98
Shaft power (kW)7.302.85
TCV-1 pressure drop (bar)1.610.39
TCV-1 opening (%)13.9628.25
TCV-4 opening (%)14.1529.96

At 65.9 per cent speed the pump absorbs 2.85 kW against 7.30 kW at full speed: 61 per cent less, with every unit still receiving its flow.

4.11 Engineering remarks#

4.12 Exercise#

The top floor is to be extended, raising the design flow of AHU-4 from 20 to 30 m³/h. In 04_Chilled Water.flmx set the selector to Base Scenario, change the set point of TCV-4 and run. Is the 3 inch branch still inside the velocity and friction limits? Run the Sizing tool again on the branch pipes B4a and B4b only and see what it chooses.

Example 5 Gasoline transfer pipeline#

Project files 05_Gasoline Pipeline.flmx 05_Gasoline Pipeline - terminal valve open.flmx

5.1 Objective#

To model a long pipeline over changing ground with two pump stations, to draw its hydraulic profile with the Graphs tool, to keep the pumping energy in a Calculator, and to see with a scenario how the pressures along the line move with throughput.

5.2 Engineering problem#

Gasoline is transferred through 48 km of 12 inch line from a tank at one terminal to a tank at another. The line drops to a river crossing at 8 m and climbs over a ridge at 205 m. One pump station stands at the start and one at kilometre 24. The flow is held at 400 m³/h by a control valve at the receiving terminal.

Where is the pressure highest, which sets the pipe rating? Where is it lowest, which decides whether the second station has suction pressure and whether the line stays full over the ridge? And how does that change with the flow?

5.3 Model schematic#

Example 5. Nominal size above each pipe, elevation in metres above each node. The line is drawn folded - out along the top to the second station and back along the bottom - so that it fits a page; every pipe keeps its real length.
Figure 60 Example 5. Nominal size above each pipe, elevation in metres above each node. The line is drawn folded - out along the top to the second station and back along the bottom - so that it fits a page; every pipe keeps its real length.

5.4 Input data#

Table 12 Example 5, input data
ItemValueBasis
FluidGasoline at 20 °CFluid library: 719 kg/m³, 0.58 cP
Unitsm³/h, barg, mUnit set of the project
T-101, sending tankOpen; base at 20.00 m, level 10.00 m
T-201, receiving tankOpen; base at 85.00 m, level 12.00 m
Line12 inch STD, 8 lengths of 6000 m; 50 m suction lineCommercial steel
Elevations, km 0 to 4820, 35, 8, 55, 95, 205, 160, 120, 85 mRoute survey, every 6 km (assumed)
PS-1Rating mode; 252 m at 400 m³/hShut-off 300 m
PS-2, at km 24Rating mode; 184 m at 400 m³/hShut-off 232 m
FCV-BControl target Flowrate, 400.00 m³/hSecond file: control target None, 100 % open
Station and terminal piping2 x open gate valve, 4 x 90° long radius elbow on L-4 and L-8From the fittings library

5.5 Model set-up#

Fluid Properties: (1) gasoline from the library, (2) its temperature.
Figure 61 Fluid Properties: (1) gasoline from the library, (2) its temperature.
L-5, one six-kilometre length: (1) length, (2) schedule, (3) nominal diameter, (4) the inside diameter that follows from them.
Figure 62 L-5, one six-kilometre length: (1) length, (2) schedule, (3) nominal diameter, (4) the inside diameter that follows from them.
PS-1: (1) Rating mode, (2) efficiency at the duty point.
Figure 63 PS-1: (1) Rating mode, (2) efficiency at the duty point.
FCV-B at the receiving terminal: (1) control target Flowrate, (2) 400 m³/h.
Figure 64 FCV-B at the receiving terminal: (1) control target Flowrate, (2) 400 m³/h.

Each node carries the ground elevation at its kilometre post. That is all the model needs to account for the static head: a pipe's rise is the difference between its two nodes.

5.6 Calculation procedure#

  1. Open 05_Gasoline Pipeline.flmx and press Run.
  2. Press Graphs on the Tools page. The file holds one graph of type Path; press Generate.
  3. To build a path graph from nothing: Add Graph, leave Graph type at Path and the x axis at Length; press Add y axis var and choose Pressure and Elevation (Figure 65); press Add path items and choose the links of the route in order from the upstream end (Figure 66); then Generate. Extend opens the chart in a window of its own.
  4. Press Calculator to see the pumping power and energy.
Choosing what to plot along the path.
Figure 65 Choosing what to plot along the path.
Choosing the route: the links in order, pumps included. Length is counted along the pipes only.
Figure 66 Choosing the route: the links in order, pumps included. Length is counted along the pipes only.

5.7 Reference results#

Example 5 solved at 400 m³/h. Flows above the pipes, pressures in barg above the nodes; the tables on the sheet give the two stations and the pumping energy.
Figure 67 Example 5 solved at 400 m³/h. Flows above the pipes, pressures in barg above the nodes; the tables on the sheet give the two stations and the pumping energy.
The hydraulic profile: pressure and elevation against distance. The two vertical steps in pressure are the pump stations.
Figure 68 The hydraulic profile: pressure and elevation against distance. The two vertical steps in pressure are the pump stations.
The Calculator: the total shaft power of the two stations, and the energy to move a thousand cubic metres.
Figure 69 The Calculator: the total shaft power of the two stations, and the energy to move a thousand cubic metres.

5.8 Interpretation#

The highest pressure in the line is 18.45 barg at the discharge of the first station, and that is what the pipe and flange rating has to cover. It is not at the lowest point of the route: the river crossing sees less, because friction has already taken its share by then.

The lowest pressures are the two the profile is drawn to find. At the suction of the second station there are 3.42 barg, which is what that pump has for NPSH (61.23 m available). At the top of the ridge there are 6.20 barg, so the line is full and under pressure at its highest point. Both are held up by the control valve at the far end, which is taking 6.51 bar at 38 per cent open.

The two stations absorb 435.93 kW between them, or 1090 kWh for every thousand cubic metres delivered.

5.9 What-if investigation#

The throughput is varied from 300 to 430 m³/h in a scenario of type Sets whose one input is the set point of FCV-B. Its outputs are the three pressures that matter, the state of the valve, and the two calculations - a Calculator result can be chosen as a scenario output like any other.

The Scenario Manager for the throughput cases.
Figure 70 The Scenario Manager for the throughput cases.
The Results table of the throughput cases in full.
Figure 71 The Results table of the throughput cases in full.

5.10 Comparison#

As the flow rises the friction rises with it and every pressure downstream of a station falls: the suction of the second station goes from 9.02 barg at 300 m³/h to 1.44 barg at 430, and the ridge from 14.31 to 3.34 barg. The valve has 2.56 bar left at 430 m³/h. The energy per thousand cubic metres falls from 1265 to 1057 kWh, because at low flow more of the pump head is being destroyed in the valve.

The second file is the limit: the terminal valve left wide open. The line then finds its own flow, 440.25 m³/h, and that is the most these two stations can move. The second station is left with 0.74 barg of suction pressure and the ridge with 2.33 barg.

The terminal valve wide open: 440 m³/h.
Figure 72 The terminal valve wide open: 440 m³/h.
The hydraulic profile with the valve open: the pressure at the second station's suction and over the ridge is at its lowest.
Figure 73 The hydraulic profile with the valve open: the pressure at the second station's suction and over the ridge is at its lowest.

5.11 Engineering remarks#

5.12 Exercise#

More throughput is wanted, and both stations can be fitted with larger impellers, which is close to running them faster. In 05_Gasoline Pipeline - terminal valve open.flmx add a scenario of type Sets with the Relative speed of PS-1 and of PS-2 as inputs and three cases - 1.00, 1.05 and 1.10 for both - and with the flow of PS-1, the pressure at KP0 and the pressure at KP30 as outputs. How much flow does ten per cent of speed buy, and what does it do to the highest pressure in the line?

Example 6 Fire water ring main#

Project file 06_Fire Water Ring Main.flmx

6.1 Objective#

To model a looped fire water main with a duty and a standby pump, to hold its fire cases in one file as a scenario and look at any of them on the sheet, and to find what the ring can deliver. The example uses the Darcy-Weisbach friction model; Example 7 uses Hazen-Williams.

6.2 Engineering problem#

A 10 inch ring 1300 m round is fed at one point from a fire water tank through a duty pump with a standby beside it. It has seven take-offs: four hydrants, two monitors and the deluge valve of a tank farm at the far corner. The fire water demand depends on where the fire is.

Does the ring deliver the design fire at the pressure the equipment needs? What is lost when one side of the ring is shut for maintenance on the day of the fire? And how much more than the design demand could the deluge valve take?

6.3 Model schematic#

Example 6. Nominal size above each pipe. The ring is R1 to R8; the feed from the pumps enters at R1, and the deluge valve DV1 is at the opposite corner.
Figure 74 Example 6. Nominal size above each pipe. The ring is R1 to R8; the feed from the pumps enters at R1, and the deluge valve DV1 is at the opposite corner.

6.4 Input data#

Table 13 Example 6, input data
ItemValueBasis
FluidWater at 25 °CFluid library
Unitsm³/h, barg, mUnit set of the project
Friction modelDarcy-WeisbachSetting, Advanced
T-FW, fire water tankOpen; base at grade, level 10.00 m
P-FW-A, duty pumpRating mode; 105 m at 681 m³/hShut-off 126 m; 70 m at 1022 m³/h
P-FW-B, standbyThe same pump, Pump on = No
Ring main RM-1 to RM-810 inch schedule 40; 125 to 200 m per side
Feed and suction12 inch; discharge 10 inch
Laterals15 m; 6 inch, 8 inch to the deluge valve
DemandsHydrant 57, monitor 114, deluge valve 340 m³/hAssumed design basis
Table 14 Fittings, chosen from the library
PipesFittings
Pump suctions S-A, S-B1 x open gate valve, 1 x 90° long radius elbow
Pump discharges D-A, D-B1 x swing check valve, 1 x open gate valve, 1 x 90° standard elbow
Feed to the ring2 x 90° standard elbow, 1 x branching tee
Ring corners RM-1, RM-3, RM-5, RM-81 x 90° standard elbow, 1 x open gate valve
Ring sides RM-2, RM-71 x open gate valve
Every lateral1 x branching tee, 1 x open gate valve
Table 15 The five fire cases, demands in m³/h
CaseFireH1H2M1M2DV1H3H4Ring
1Two hydrants5757whole
2Process unit5711411457whole
3Tank farm (design)5711411434057whole
4Tank farm5711411434057east side RM-7 closed
5Tank farm5711411434057west side RM-2 closed

6.5 Model set-up#

P-FW-A, the duty pump: (1) Pump on, (2) Rating mode on its curve.
Figure 75 P-FW-A, the duty pump: (1) Pump on, (2) Rating mode on its curve.
P-FW-B, the standby: (1) Pump on is No. The pump stays in the model and passes nothing.
Figure 76 P-FW-B, the standby: (1) Pump on is No. The pump stays in the model and passes nothing.
DV1, the deluge valve take-off: (1) a known flow, (2) leaving the network.
Figure 77 DV1, the deluge valve take-off: (1) a known flow, (2) leaving the network.
L-DV1, the lateral to the deluge valve: (1) length, (2) nominal diameter, (3) the fittings K factor.
Figure 78 L-DV1, the lateral to the deluge valve: (1) length, (2) nominal diameter, (3) the fittings K factor.
Fittings & Pipe Losses for a lateral: the tee off the ring, where the flow turns, and an isolating gate valve.
Figure 79 Fittings & Pipe Losses for a lateral: the tee off the ring, where the flow turns, and an isolating gate valve.
Fittings & Pipe Losses for a pump discharge: a swing check valve, an isolating valve and a bend.
Figure 80 Fittings & Pipe Losses for a pump discharge: a swing check valve, an isolating valve and a bend.

A pipe has a Status. Normal carries flow; Closed takes it out of the calculation without removing it from the drawing, which is how a shut sectional valve is modelled.

RM-7, a side of the ring: (1) Status, Normal here and Closed in case 4.
Figure 81 RM-7, a side of the ring: (1) Status, Normal here and Closed in case 4.

6.6 Calculation procedure#

  1. Open 06_Fire Water Ring Main.flmx and press Run. The base case is the design fire.
  2. Press Scenario on the Tools page to see how the five cases are set up (Figure 84). The inputs are the Flow In of the seven take-offs and the Status of RM-7 and RM-2; a status is typed as Normal or Closed.
  3. Close the Scenario Manager. On the Home page choose a case in the case selector; the sheet, the tables on it and the table of the selected element all show that case.
  4. Set the selector back to Base Scenario before changing anything.
Selecting the scenario inputs: the object in the left list, its variable in the middle, > to add it to the selection.
Figure 82 Selecting the scenario inputs: the object in the left list, its variable in the middle, > to add it to the selection.

6.7 Reference results#

The design fire at the tank farm. Flows in m³/h, pressures in barg. The water goes both ways round from R1 and meets at the far corner.
Figure 83 The design fire at the tank farm. Flows in m³/h, pressures in barg. The water goes both ways round from R1 and meets at the far corner.
The Scenario Manager with the five fire cases.
Figure 84 The Scenario Manager with the five fire cases.
The Results table of the fire cases. Part 1 of 2; the first column is repeated.
Figure 85 The Results table of the fire cases. Part 1 of 2; the first column is repeated.
The Results table of the fire cases. Part 2 of 2; the first column is repeated.
Figure 86 The Results table of the fire cases. Part 2 of 2; the first column is repeated.

6.8 Interpretation#

In the design fire the duty pump delivers 682.00 m³/h at 104.84 m, close to its rated point. The ring splits it: 329 m³/h goes west about and 353 east about. The deluge valve, the furthest take-off and the largest, has 10.19 barg. The Calculator holds the lowest pressure at any take-off, 10.19 barg, so the question whether every take-off has its pressure is answered by one number in every case.

The Calculator: the lowest pressure at any of the seven take-offs, as min() of seven variables.
Figure 87 The Calculator: the lowest pressure at any of the seven take-offs, as min() of seven variables.

6.9 What-if investigation#

Choose Case-4 in the case selector. The east side of the ring is shut, and everything for the tank farm has to go the long way round.

The Home page with Case-4 chosen.
Figure 88 The Home page with Case-4 chosen.
Case-4, the design fire with RM-7 closed. The closed pipe is drawn dashed and carries nothing; RM-6 now runs backwards, shown by its negative flow, to feed hydrant H3 from the far side.
Figure 89 Case-4, the design fire with RM-7 closed. The closed pipe is drawn dashed and carries nothing; RM-6 now runs backwards, shown by its negative flow, to feed hydrant H3 from the far side.
The table of the selected element for DV1 with Case-4 chosen.
Figure 90 The table of the selected element for DV1 with Case-4 chosen.
Case-5, the west side RM-2 closed instead.
Figure 91 Case-5, the west side RM-2 closed instead.

6.10 Comparison#

From the Results table: with the whole ring the deluge valve has 10.19 barg; with the east side shut 8.10 barg, and with the west side shut 8.90 barg. The pump is doing exactly the same in all three - the demands are fixed - so the 2.09 bar is what the second path round the ring is worth. The lowest take-off pressure falls from 10.19 to 8.10 barg. In the two smaller fires the pump runs back up its curve and every take-off has more than 12 barg.

How much could the deluge valve take? An Adjust in the same file varies the Flow In of DV1 until the pressure at DV1 falls to 7.00 barg, taken here as the least the deluge system needs at its inlet.

Adjust: the demand at DV1 that brings its pressure down to 7.00 barg. A demand is negative, so the adjusted value is negative.
Figure 92 Adjust: the demand at DV1 that brings its pressure down to 7.00 barg. A demand is negative, so the adjusted value is negative.

The answer is 585 m³/h against the design demand of 340: with the other design demands running, the ring and the pump have that much in hand for the tank farm.

6.11 Engineering remarks#

6.12 Exercise#

Add a sixth case to the scenario: the design fire with both pumps running. Add the Pump status of P-FW-B to the inputs - it is typed ON or OFF - press Add case for the sixth, type OFF for the first five cases and ON for the sixth, and run. By how much does the pressure at DV1 rise, and what flow does each pump now deliver?

Example 7 Spray systems on two tanks#

Project files 07a_Spray - cylindrical tank.flmx 07b_Spray - rectangular tank, tree.flmx 07b_Spray - rectangular tank, grid.flmx

7.1 Objective#

To lay out, build and prove a water spray system with the Nozzle Layout tool: describe the tank, let Auto layout choose the nozzles, Insert the nozzles and their sized pipework into the model, run it, and use Adjust to find the supply pressure at which the worst nozzle has exactly what it needs. The example is calculated with the Hazen-Williams friction model.

7.2 Engineering problem#

Two tanks are to be given water spray cooling at 10.2 L/min for every square metre of exposed surface. One is a vertical cylindrical tank 5 m in diameter and 6 m high, to be ringed. The other is the flat roof of a rectangular tank, 10 m by 4 m, to be covered from above; its pipework can be run as a tree, with a main along the middle and a short branch to each nozzle either side of it, or as a grid, with a main along one edge and one branch line carrying each row of nozzles.

How many nozzles, where, on what pipe, and what must the fire water supply deliver at the foot of each system?

7.3 Model schematic#

The cylindrical tank system as inserted: two rings of six nozzles, the drop to each ring, the riser and the supply. Nominal size above each pipe, elevation above each node. Nothing here was drawn by hand.
Figure 93 The cylindrical tank system as inserted: two rings of six nozzles, the drop to each ring, the riser and the supply. Nominal size above each pipe, elevation above each node. Nothing here was drawn by hand.
The rectangular roof as a tree: one main, four pairs of branches.
Figure 94 The rectangular roof as a tree: one main, four pairs of branches.
The same eight nozzles as a grid: a main at one side and a branch line for each row of four.
Figure 95 The same eight nozzles as a grid: a main at one side and a branch line for each row of four.

7.4 Input data#

Table 16 Example 7, input data
ItemCylindrical tankRectangular roof
FluidWater at 25 °CWater at 25 °C
UnitsL/min, barg, mL/min, barg, m
Friction modelHazen-Williams, C = 120Hazen-Williams, C = 120
Surface5.00 m diameter, 6.00 m high10.00 m by 4.00 m
Duty10.2 L/min/m² of shell10.2 L/min/m²
NozzleK = 41 L/min/√barK = 26 L/min/√bar, 120° cone, 1.00 m standoff
PipeSchedule 40 steel, sized for 3 m/sSchedule 40 steel, sized for 3 m/s
SupplyA known pressure at grade, to be foundA known pressure at grade, to be found

Design basis The density of 10.2 L/min/m² and the limits in Figure 98 are the figures the tool is seeded with, taken from NFPA 15. They are the basis assumed for this example; confirm every one against the edition and the project specification that apply.

7.5 Model set-up#

The friction model. Fire water spray systems are calculated with Hazen-Williams. Press Setting on the Tools page, choose Advanced, and under Pressure drop model select Hazen Williams. Pipes then carry a C coefficient instead of a roughness, and their fittings are held as equivalent lengths instead of K factors.

Setting, Advanced: (1) the Hazen-Williams model.
Figure 96 Setting, Advanced: (1) the Hazen-Williams model.

The arrangement. Press Nozzle Layout on the Tools page. Choose the Shape type, describe the tank and the nozzle, and press Auto layout: the tool finds the fewest nozzles that satisfy every rule and reports what each will pass and at what pressure.

Nozzle Layout for the cylindrical tank. (1) the tank, (2) what the duty is applied to, (3) the nozzle K, (4) Auto layout, (5) Insert. The results in the middle and the sketch at the right follow every change.
Figure 97 Nozzle Layout for the cylindrical tank. (1) the tank, (2) what the duty is applied to, (3) the nozzle K, (4) Auto layout, (5) Insert. The results in the middle and the sketch at the right follow every change.

For the cylinder Auto layout gives 2 rings of 6 nozzles, 12 in all, each passing 80.11 L/min at 3.818 barg, 961.3 L/min in total. The rings are 3.000 m apart and the nozzles 2.618 m apart round the shell.

Design rules: the limits the layout is checked against, each with a note of where it comes from. A result that breaks one is shown in red.
Figure 98 Design rules: the limits the layout is checked against, each with a note of where it comes from. A result that breaks one is shown in red.
Nozzle Layout for the rectangular roof. (1) the surface, (2) the spray angle and (3) the standoff, which together give the circle each nozzle wets, (4) Auto layout. The sketch shows the circles and their overlap.
Figure 99 Nozzle Layout for the rectangular roof. (1) the surface, (2) the spray angle and (3) the standoff, which together give the circle each nozzle wets, (4) Auto layout. The sketch shows the circles and their overlap.

For the roof Auto layout gives 4 columns by 2 rows, 8 nozzles each passing 51.00 L/min at 3.848 barg. Each wets a circle 3.464 m across; the nozzles are 2.449 m apart and the circles overlap by 29.29 per cent.

7.6 Calculation procedure#

  1. Start a new project, set the units and choose Hazen Williams as above.
  2. Open Nozzle Layout, fill in the tank and the nozzle from Table 16 and press Auto layout.
  3. Press Insert. The Insert dialog asks how the pipework is to be built (Figure 100): leave Size the pipework as it is inserted ticked, choose the schedule and the maximum velocity, and for a ring tick All rings the same size. Press Insert in the dialog.
  4. Click on the flowsheet where the system is to stand. The nozzles, the pipes, their lengths, elevations, sizes and fittings are all created, with a supply node at grade given a first pressure.
  5. Press Run.
The Insert dialog for the rings: the geometry proposed by the arrangement, and the preliminary line sizing.
Figure 100 The Insert dialog for the rings: the geometry proposed by the arrangement, and the preliminary line sizing.
The Insert dialog for the roof, where Tree or Grid is chosen.
Figure 101 The Insert dialog for the roof, where Tree or Grid is chosen.

What Insert builds is ordinary model. Every nozzle is a spray nozzle element with its K factor, its required flow and its minimum pressure; every pipe has a schedule size and a C coefficient; and each pipe where the flow turns - at an elbow, or into a branch at a tee - carries that fitting as an equivalent length from the NFPA table.

A nozzle as inserted: (1) K factor, (2) required flow, (3) minimum pressure.
Figure 102 A nozzle as inserted: (1) K factor, (2) required flow, (3) minimum pressure.
A ring pipe in a Hazen-Williams project: (1) length, (2) nominal diameter, (3) C coefficient, (4) the equivalent length of its fittings.
Figure 103 A ring pipe in a Hazen-Williams project: (1) length, (2) nominal diameter, (3) C coefficient, (4) the equivalent length of its fittings.
Fittings & Pipe Losses in a Hazen-Williams project: equivalent lengths for this pipe's size and C, and the tee the insert gave it.
Figure 104 Fittings & Pipe Losses in a Hazen-Williams project: equivalent lengths for this pipe's size and C, and the tee the insert gave it.

7.7 Reference results#

The cylindrical tank system solved as inserted. Flows in L/min above the pipes, pressures in barg under the nodes.
Figure 105 The cylindrical tank system solved as inserted. Flows in L/min above the pipes, pressures in barg under the nodes.
The top ring, with the Scale box on the Home page set to 100 %. Water enters at N1 and goes both ways round; P4 carries a negative flow because the two streams meet just short of N5.
Figure 106 The top ring, with the Scale box on the Home page set to 100 %. Water enters at N1 and goes both ways round; P4 carries a negative flow because the two streams meet just short of N5.
The two tables on the sheet: six nozzles of the top ring, and the supply flow and least overdesign from the Calculator.
Figure 107 The two tables on the sheet: six nozzles of the top ring, and the supply flow and least overdesign from the Calculator.

As inserted, the supply node N20 holds 4.90 barg - the nozzle pressure plus the static lift to the top of the tank plus a margin of half a bar - and the system takes 1021 L/min against the 961.3 required. Every nozzle is over its required flow; the least is 4.4 per cent over. The insert chose 16 x 2 in, 3 x 3 in, 2 x 4 in pipe.

7.8 Interpretation#

A ring is fed at one point and the water goes both ways round, so the nozzle opposite the feed is reached by two half-rings instead of one whole one. That is why a 2 inch ring is enough and why the six nozzle pressures of Figure 107 differ by only 25 mbar. The larger difference is between the rings: the top ring stands three metres above the lower one, and its nozzles have about 0.29 bar less. The worst nozzle is therefore on the top ring, and it is Nz3.

Overdesign is how far a nozzle's flow is above its required flow. A positive figure on every nozzle means the supply pressure is more than the system needs; the question is how much more.

7.9 What-if investigation#

The supply pressure the system needs is the one at which the worst nozzle is exactly at its minimum pressure of 3.82 barg. Adjust finds it: the adjusted variable is the Pressure of the supply node N20, the target is the Pressure of nozzle Nz3, and the target value is 3.82.

Adjust for the cylindrical tank: the supply pressure that leaves the worst nozzle at its minimum.
Figure 108 Adjust for the cylindrical tank: the supply pressure that leaves the worst nozzle at its minimum.

The answer is 4.55 barg at grade, at which the system takes 980 L/min. Press Apply Solution to write it into the supply node. These two numbers - a flow and the pressure it is wanted at - are the demand this spray system places on the fire water main, and are what a take-off of Example 6 stands for.

7.10 Comparison#

The rectangular roof is inserted twice from the same arrangement, once as a tree and once as a grid, and each is adjusted in the same way.

The tree solved as inserted. Flows in L/min above the pipes.
Figure 109 The tree solved as inserted. Flows in L/min above the pipes.
The tables on the tree's sheet.
Figure 110 The tables on the tree's sheet.
The grid solved as inserted.
Figure 111 The grid solved as inserted.
The tables on the grid's sheet.
Figure 112 The tables on the grid's sheet.
Adjust for the tree.
Figure 113 Adjust for the tree.
Adjust for the grid.
Figure 114 Adjust for the grid.
Table 17 The three systems
Cylinder, ringsRoof, treeRoof, grid
Nozzles1288
Pipe chosen by the insert16 x 2 in, 3 x 3 in, 2 x 4 in8 x 0.75 in, 2 x 1.5 in, 1 x 2 in, 1 x 3 in2 x 0.75 in, 8 x 1.5 in, 1 x 3 in
Supply pressure as inserted (barg)4.904.454.45
Flow as inserted (L/min)1021.49420.17424.88
Least overdesign as inserted (%)4.371.732.28
Worst nozzleNz3Nz7Nz8
Supply pressure needed, by Adjust (barg)4.554.304.26
Flow at that pressure (L/min)980.20413.00415.44

The grid needs 0.04 bar less at the supply than the tree for the same eight nozzles. It is not free: the insert gives the grid larger branch pipe, because each branch now carries four nozzles instead of one. The comparison a designer makes is that pressure against that pipe.

7.11 Engineering remarks#

7.12 Exercise#

The 2 inch rings are to be tried at 1.5 inch to save pipe. Open 07a_Spray - cylindrical tank.flmx, press Apply Solution in Adjust so that the supply is at 4.55 barg, then change the ring pipes of the top ring to 1.5 inch and run. Which nozzle is now the worst, and by how much is it under its required flow? Use Adjust again to find the new supply pressure, and decide whether the smaller pipe is worth it.

Example 8 LNG rundown line#

Project file 08_LNG Rundown Line.flmx

8.1 Objective#

To model a cryogenic rundown line with a fluid and a pipe material taken from the libraries, to follow the pressure along it with a path graph, and to keep in a Calculator the one number that decides whether the design works: how far the liquid is above its bubble point when it reaches the last valve.

8.2 Engineering problem#

LNG leaves the product drum of a liquefaction train at its bubble point. A rundown pump sends it through 1.5 km of 16 inch stainless steel line on a pipe rack and up the side of a storage tank to its roof, 42 m above grade, where a flow control valve lets it down into the tank's vapour space.

Anywhere the pressure in the line falls to the vapour pressure the liquid flashes. The lowest pressure is at the top of the tank, just before the valve: the pump's head has been spent on friction and on 41 m of lift. Is there margin there, and how much rundown can the line take before it is gone?

8.3 Model schematic#

Example 8. Nominal size above each pipe, elevation in metres above each node.
Figure 115 Example 8. Nominal size above each pipe, elevation in metres above each node.

8.4 Input data#

Table 18 Example 8, input data
ItemValueBasis
FluidLNG at -158 °CFluid library: 450.00 kg/m³, 0.14 cP, vapour pressure 0.25 barg
Unitsm³/h, barg, mUnit set of the project
V-1601, product drum0.25 barg; base at 5.00 m, level 2.00 mAt the bubble point of the liquid
P-1601Rating mode; 74.5 m at 1250 m³/hShut-off 96 m; best efficiency 80 %
L-1, suction15 m of 20 inch schedule 10S1 x open gate valve, 2 x 90° long radius elbow
L-2, up to the rack30 m of 16 inch schedule 10S1 x swing check valve, 1 x open gate valve, 2 x 90° long radius elbow
L-3 to L-5, on the rack at 8 m500, 500 and 440 m10 x 90° long radius elbow each: expansion loops
L-6, down from the rack30 m2 x 90° long radius elbow
L-7, up the tank to 42 m42 m3 x 90° long radius elbow, 1 x open gate valve
Pipe materialStainless SteelMaterial library: roughness 0.015 mm
FCV-1Control target Flowrate, 1250.00 m³/h
Tank vapour space0.15 barg at 42 mKnown pressure at the outlet

Library data The LNG properties in the fluid library are for a typical lean LNG and are tabulated from -165 to -150 °C. A real rundown must be calculated with the properties of the actual composition; type them in Fluid Properties, or add the composition as a new fluid in the Database.

8.5 Model set-up#

Fluid Properties: (1) LNG from the library, (2) at -158 °C, where its vapour pressure equals the drum pressure.
Figure 116 Fluid Properties: (1) LNG from the library, (2) at -158 °C, where its vapour pressure equals the drum pressure.
V-1601, the product drum: (1) elevation of its base, (2) liquid level, (3) the pressure on the surface.
Figure 117 V-1601, the product drum: (1) elevation of its base, (2) liquid level, (3) the pressure on the surface.
L-3, a length on the rack: (1) length, (2) schedule 10S, (3) the material, from the library, which sets the roughness; (4) the fittings K factor.
Figure 118 L-3, a length on the rack: (1) length, (2) schedule 10S, (3) the material, from the library, which sets the roughness; (4) the fittings K factor.
Fittings & Pipe Losses for L-3: ten long radius elbows, which is two and a half expansion loops.
Figure 119 Fittings & Pipe Losses for L-3: ten long radius elbows, which is two and a half expansion loops.
P-1601: (1) Rating mode, (2) efficiency at the duty point.
Figure 120 P-1601: (1) Rating mode, (2) efficiency at the duty point.
FCV-1 on the tank roof: (1) control target Flowrate, (2) the rundown rate; (3) the opening is a result.
Figure 121 FCV-1 on the tank roof: (1) control target Flowrate, (2) the rundown rate; (3) the opening is a result.

8.6 Calculation procedure#

  1. Open 08_LNG Rundown Line.flmx and press Run.
  2. Press Graphs and Generate for the pressure and elevation along the line.
  3. Press Calculator. The first calculation is the pressure at N9, the inlet of the valve, less 0.25, the bubble point pressure in barg.
  4. Press Scenario for the rundown rates of section 8.9.

8.7 Reference results#

Example 8 solved at 1250 m³/h. Flows above the pipes, pressures in barg above the nodes; the tables on the sheet give the pump, the valve and the two checks.
Figure 122 Example 8 solved at 1250 m³/h. Flows above the pipes, pressures in barg above the nodes; the tables on the sheet give the pump, the valve and the two checks.
Pressure and elevation along the rundown line. The pressure steps up at the pump, falls slowly along the rack, and drops sharply as the line climbs the tank.
Figure 123 Pressure and elevation along the rundown line. The pressure steps up at the pump, falls slowly along the rack, and drops sharply as the line climbs the tank.
The Calculator: the margin over the bubble point at the valve inlet, and the pumping energy.
Figure 124 The Calculator: the margin over the bubble point at the valve inlet, and the pumping energy.

8.8 Interpretation#

The pump delivers 1250 m³/h at 74.48 m for 142.70 kW. The pressure at its discharge is 3.79 barg; 0.89 barg is left at N9 on the tank roof, 0.64 bar above the bubble point. Of what was lost on the way, the climb up the side of the tank, from N8 to N9, took 1.86 bar, almost all of it static head: a liquid of 450 kg/m³ loses only 0.44 bar for every ten metres, but the roof is 41 m above the pump.

The valve takes 0.73 bar at 32 per cent open, and it is deliberately the last thing in the line: the liquid is kept above its bubble point all the way up, and flashes only across the valve, into the tank.

The NPSH available at the pump is 5.78 m. A liquid at its bubble point has no NPSH of its own; all of it is the liquid level in the drum above the pump, less the loss in the suction line.

8.9 What-if investigation#

The rundown rate is varied from 1000 to 1375 m³/h in a scenario of type Sets on the set point of FCV-1. The margin from the Calculator is one of its outputs.

The Scenario Manager for the rundown rates.
Figure 125 The Scenario Manager for the rundown rates.
The Results table of the rundown rates in full.
Figure 126 The Results table of the rundown rates in full.

8.10 Comparison#

The margin over the bubble point is 1.37 bar at 1000 m³/h, 0.64 bar at 1250 and 0.21 bar at 1375. It falls quickly because two things happen together as the flow rises: the pump gives less head, 69.95 m at 1375 against 82.24 m at 1000, and the line takes more. At 1375 m³/h the valve is 54 per cent open with 0.30 bar across it: the line is close to the most it can pass, and close to flashing at the roof.

Case-4 chosen in the case selector: 1375 m³/h.
Figure 127 Case-4 chosen in the case selector: 1375 m³/h.

8.11 Engineering remarks#

8.12 Exercise#

The rundown is to be raised to 1500 m³/h. Show that the present line cannot do it: set the selector to Base Scenario, set FCV-1 to control target None and 100 per cent open, run, and read the flow. Then change the three rack lengths L-3, L-4 and L-5 to 18 inch schedule 10S and run again. What flow does the line now pass wide open, and what is the margin over the bubble point at 1500 m³/h with the valve controlling?

Example 9 Three pumps in parallel, and an NPSH problem#

Project files 09_Parallel Pumps.flmx 09_Parallel Pumps - one pump, suction study.flmx 09_Parallel Pumps - 16 in suction.flmx

9.1 Objective#

To run a station of three pumps in parallel with one, two and three in service as a scenario, to see why the flow does not add up, and to find and cure the NPSH problem that appears when one pump runs alone. The example introduces the NPSH required curve of a pump, the warnings list, and a scenario on a pipe size.

9.2 Engineering problem#

A cooling water station has three identical pumps, each rated 600 m³/h at 42 m, drawing from a basin through a common suction header and discharging through non-return valves into a 900 m, 16 inch main to a cooling tower deck. Two pumps carry the normal duty and the third is the spare. The pumps stand a metre and a half above the basin water, and their suction lines are 10 inch.

The station has run for years on two pumps. During an outage one pump is run alone to keep part of the plant cooled, and it is noisy and its discharge pressure flickers: the signs of cavitation. Why does a pump that is content beside another object to running alone, and what is to be done about it?

9.3 Model schematic#

Example 9. Nominal size above each pipe, elevation in metres above each node. The basin water surface is at 3.00 m and the pumps at 4.50 m.
Figure 128 Example 9. Nominal size above each pipe, elevation in metres above each node. The basin water surface is at 3.00 m and the pumps at 4.50 m.

9.4 Input data#

Table 19 Example 9, input data
ItemValueBasis
FluidWater at 30 °CFluid library: vapour pressure 0.042 bar absolute
Unitsm³/h, barg, mUnit set of the project
BASINOpen; floor at grade, level 3.00 m
DECK, cooling towerOpen; floor at 14.00 m, level 1.00 mStatic lift 12 m
P-A, P-B, P-CRating mode; 42.0 m at 600 m³/h; pumps at 4.50 mCurve and NPSH required: the pump curve data in section 9.5
SH, suction header12 m of 20 inch2 x 90° long radius elbow
PS-A to PS-C, suction lines6 m of 10 inch schedule 401 x branching tee, 1 x open gate valve, 1 x 90° long radius elbow
NRV-A to NRV-CValve with No reverse flow
PD-A to PD-C, discharge lines6 m of 10 inch1 x 90° standard elbow, 1 x open gate valve, 1 x branching tee
M-1, M-2, the main450 m of 16 inch each4 x 90° standard elbow each
PLANTPD, 1.20 bar at 1200 m³/hThe exchangers, lumped

9.5 Model set-up#

P-A. (1) Pump on, (2) Rating mode, (3) efficiency at the duty point. The chart carries head, efficiency and NPSH required against flow.
Figure 129 P-A. (1) Pump on, (2) Rating mode, (3) efficiency at the duty point. The chart carries head, efficiency and NPSH required against flow.

A pump's curve is typed point by point: press Enter data in the pump window. The fourth column is the NPSH the pump requires at each flow, from the maker's curve. With it entered FlowMax compares the NPSH available with the NPSH required at the flow the pump is running at.

Pump curve data for P-A: flow, head, efficiency and NPSH required. NPSHr rises steeply to the right of the rated point.
Figure 130 Pump curve data for P-A: flow, head, efficiency and NPSH required. NPSHr rises steeply to the right of the rated point.
NRV-A, a non-return valve: (1) No reverse flow.
Figure 131 NRV-A, a non-return valve: (1) No reverse flow.
PS-A, a suction line: (1) length, (2) nominal diameter, (3) the fittings K factor, the total of Figure 133.
Figure 132 PS-A, a suction line: (1) length, (2) nominal diameter, (3) the fittings K factor, the total of Figure 133.
Fittings & Pipe Losses for a suction line: the tee off the header, an isolating valve and a bend.
Figure 133 Fittings & Pipe Losses for a suction line: the tee off the header, an isolating valve and a bend.
PLANT, the lumped resistance of the exchangers: (1) reference flow, (2) reference pressure drop.
Figure 134 PLANT, the lumped resistance of the exchangers: (1) reference flow, (2) reference pressure drop.

9.6 Calculation procedure#

  1. Open 09_Parallel Pumps.flmx and press Run. Two pumps are on in the base case.
  2. Press Scenario on the Tools page. The inputs are the Pump status of P-B and P-C, typed ON or OFF; the three cases are one, two and three pumps running.
  3. Close it and choose Case-1, one pump alone, in the case selector on the Home page.
  4. Press Graphs for P-A against the system it shares.
  5. Open 09_Parallel Pumps - one pump, suction study.flmx, in which one pump alone is the base case, and press Run. The message that ends the run offers Warnings / Errors; press itto open the list.

9.7 Reference results#

Two pumps running, the normal duty. Flows in m³/h, pressures in barg; the tables on the sheet give the three pumps and the station totals from the Calculator.
Figure 135 Two pumps running, the normal duty. Flows in m³/h, pressures in barg; the tables on the sheet give the three pumps and the station totals from the Calculator.
The table of the selected element for P-A with two pumps running.
Figure 136 The table of the selected element for P-A with two pumps running.
The Scenario Manager: one, two and three pumps running.
Figure 137 The Scenario Manager: one, two and three pumps running.
The Results table of the pump cases in full.
Figure 138 The Results table of the pump cases in full.
Graphs, Pump-system curve, for P-A with two pumps running. The system curve is what P-A sees while P-B runs beside it.
Figure 139 Graphs, Pump-system curve, for P-A with two pumps running. The system curve is what P-A sees while P-B runs beside it.

9.8 Interpretation#

Two pumps deliver 1166 m³/h between them, 583 each. Three deliver 1297, not half as much again: every extra pump pushes the main further up its square-law resistance, so each one is pushed back along its curve to 432 m³/h. One pump alone does the opposite. With the main almost empty of friction it runs out to 819 m³/h, 36 per cent beyond its rated flow, at only 31.69 m.

The energy to move a thousand cubic metres is 114, 143 and 180 kWh with one, two and three pumps: the more water is pushed through the same main, the more each cubic metre costs.

9.9 What-if investigation#

Now the NPSH. The NPSH available to P-A is in the scenario table: 7.63 m with three running, 7.22 m with two and 6.35 m alone. It falls because the suction line carries more flow and loses more. At the same time the pump needs more: from the curve of Figure 130 the NPSH required is 3.34 m at 432 m³/h, 4.11 m at 583 and 6.88 m at 819. Alone, the pump has 6.35 m and needs 6.88 m. It is 0.53 m short, and it cavitates.

One pump alone: 819 m³/h through a 10 inch suction line at 4.47 m/s.
Figure 140 One pump alone: 819 m³/h through a 10 inch suction line at 4.47 m/s.
The table of the selected element for P-A running alone: NPSHa 6.35 m.
Figure 141 The table of the selected element for P-A running alone: NPSHa 6.35 m.
The warnings list after the run: NPSHa is lower than NPSHr, against P-A.
Figure 142 The warnings list after the run: NPSHa is lower than NPSHr, against P-A.

Three things could cure it: more water over the pump, a pump that needs less, or less loss in the suction line. The first two are civil work and a new pump. The third is a pipe, and the velocity in Figure 140 says it is the right place to look: 4.47 m/s is far too fast for a suction line. The second file studies it with a scenario whose one input is the Inside diameter of PS-A, for the schedule 40 sizes 10, 12, 14 and 16 inch.

The Scenario Manager for the suction size, with one pump running alone as the base case.
Figure 143 The Scenario Manager for the suction size, with one pump running alone as the base case.
The Results table of the suction sizes.
Figure 144 The Results table of the suction sizes.

9.10 Comparison#

Table 20 One pump alone: NPSH available against the suction line size
Suction lineFlow (m³/h)Velocity (m/s)NPSHa (m)NPSHr at that flow (m)Margin (m)
10 inch818.504.476.356.88-0.53
12 inch828.803.197.357.070.28
14 inch832.002.657.677.130.54
16 inch834.802.037.957.180.77

A larger suction line gives the pump more NPSH and, because it also lets the pump run a little further out, asks slightly more of it. Twelve inch removes the deficit but leaves almost nothing in hand. Against a project rule of at least 0.6 m of margin, taken here as the criterion, 16 inch is the size that passes.

09_Parallel Pumps - 16 in suction.flmx is the station with all three suction lines changed to 16 inch, and the pump scenario run again.

PS-A at 16 inch: (1) the nominal diameter chosen from the schedule, (2) the inside diameter that follows.
Figure 145 PS-A at 16 inch: (1) the nominal diameter chosen from the schedule, (2) the inside diameter that follows.
The pump cases with 16 inch suction lines.
Figure 146 The pump cases with 16 inch suction lines.
The Results table with 16 inch suction lines.
Figure 147 The Results table with 16 inch suction lines.

One pump alone now has 7.95 m available at 835 m³/h against 7.18 m required, a margin of 0.77 m, and the run raises no warning. With two and three pumps the NPSH available is 8.04 and 8.08 m; the normal duty is hardly changed.

Case-1 with 16 inch suction lines: one pump alone, and no warning.
Figure 148 Case-1 with 16 inch suction lines: one pump alone, and no warning.

9.11 Engineering remarks#

9.12 Exercise#

Instead of changing the pipe, could the single pump simply be held back from running out? In 09_Parallel Pumps - one pump, suction study.flmx use Adjust with the Reference pressure drop of PLANT as the adjusted variable and the flow of P-A as the target, and find the plant resistance at which the pump is held to 700 m³/h. Then read the NPSH available and compare it with the NPSH required at 700 m³/h from Figure 130. Is throttling a cure, and what does it cost in cooling water?

Example 10 A warehouse sprinkler system, NFPA 13#

Project file 10_Sprinklers - warehouse, NFPA 13.flmx

10.1 Objective#

To calculate a wet pipe sprinkler system the way NFPA 13 sets the calculation out, on FlowMax's isometric sheet: the sprinklers as spray nozzles with their K factor, the pipe in Hazen-Williams, the tees and elbows drawn on the sheet carrying their NFPA equivalent lengths, Adjust to find the pressure the system needs where it is fed, and the NFPA calculation of the PDF report with its graph of the water supply against the demand.

10.2 Engineering problem#

A warehouse is to be protected by a wet pipe sprinkler system designed to NFPA 13 for Ordinary Hazard Group 2: a density of 8.1 mm/min (8.1 L/min for every square metre) over a design area of 139 m². The sprinklers are K80 pendents, 3.0 m apart on branch lines 4.0 m apart, so each covers 12 m² and must discharge at least 97.2 L/min. Twelve sprinklers make the design area, and NFPA 13 asks for it to be a rectangle 1.2√A = 14.1 m long along the branch lines: five sprinklers on each of two lines and two on a third, at the far end of the lines farthest from the riser.

The system is fed from the town main through 60 m of 6 in. cement-lined underground. A flow test at the connection gave 5.5 barg static and 4.0 barg residual with 3800 L/min flowing, and 950 L/min must be allowed for hose streams. What does the system need at the connection, and is the town main enough?

10.3 Model schematic#

Example 10 on the isometric sheet. Names above and nominal sizes under the pipes, names and elevations at the nodes. Only the twelve sprinklers of the design area are drawn: the pipe from the cross main to the first of them carries the run past the sprinklers that stay shut.
Figure 149 Example 10 on the isometric sheet. Names above and nominal sizes under the pipes, names and elevations at the nodes. Only the twelve sprinklers of the design area are drawn: the pipe from the cross main to the first of them carries the run past the sprinklers that stay shut.

10.4 Input data#

Table 21 Example 10, input data
ItemValueBasis
FluidWater at 25 °C, 996.9 kg/m³
UnitsL/min, barg, m
Friction modelHazen-Williams, C 120 (black steel, wet); C 140 underground (cement lined)NFPA 13
HazardOrdinary Hazard Group 2: 8.1 mm/min over 139 m²NFPA 13 density/area curve
SprinklersK 80 L/min/√bar, 12 m² each, required 97.2 L/min, at least 0.5 barNFPA 13
Branch lines13.5 m of 2-1/2 in. to the first open sprinkler, then 1-1/2, 1-1/2, 1-1/4 and 1 in.; 3 m apart; 8.5 m up
Cross main4 in. for 32 m from the riser, then 3 in.; lines 4 m apart
Riser4 in., 8.5 m, OS&Y gate valve and alarm check valveAlarm valve taken as a swing check
Underground6 in., 60 m, post indicator valve
Water supply test5.5 barg static, 4.0 barg residual at 3800 L/minTown main flow test
Hose allowance950 L/minNFPA 13, Ordinary Hazard

Design basis The hazard, the density, the sprinkler and the water supply test are assumed for the example. On a project they come from the owner's hazard classification, the sprinkler's listing and a flow test witnessed at the connection.

10.5 Model set-up#

The friction model. Press Setting on the Home page, choose Advanced, and select Hazen Williams. Pipes then carry a C factor, and fittings are held as equivalent lengths of pipe, as NFPA 13 tabulates them. The box beside it, Velocity pressure, is left clear: NFPA 13 lets the calculation be made by total pressure alone (section 10.9 ticks it).

Setting, Advanced: (1) Hazen-Williams, (2) the velocity pressure, left clear here.
Figure 150 Setting, Advanced: (1) Hazen-Williams, (2) the velocity pressure, left clear here.

The isometric sheet. Right-click on an empty part of the sheet and choose Drawing mode, then Isometric. The grid becomes a lattice of lines at 30 degrees, and every node drawn lands on it: pipes run along the three axes of an isometric drawing - east down to the right, north up to the right, and up. The drawing mode is saved with the project. It changes how the model is drawn, not how it is calculated: lengths and elevations are typed, never measured off the sheet.

The sprinklers. Each is a Spray element from the Equipment strip, drawn from its branch line node to a tip node of its own that discharges to atmosphere. Its window takes the K factor, the required flow and the minimum pressure.

A sprinkler: (1) K factor, (2) required flow, 12 m² x 8.1 L/min/m², (3) the least pressure NFPA 13 allows.
Figure 151 A sprinkler: (1) K factor, (2) required flow, 12 m² x 8.1 L/min/m², (3) the least pressure NFPA 13 allows.

The pipes. In a Hazen-Williams project the pipe window offers a material from the C factor list and shows the pipe's equivalent length of fittings. The riser carries its two valves in its own list, from Details Fittings: the OS&Y gate valve and the alarm check valve, together 7.30 m of 4 in. pipe.

The riser: (1) length, (2) nominal diameter, (3) the C factor its material gives, (4) the equivalent length of its own fittings.
Figure 152 The riser: (1) length, (2) nominal diameter, (3) the C factor its material gives, (4) the equivalent length of its own fittings.
Fittings & Pipe Losses of the riser in a Hazen-Williams project: each fitting as an equivalent length for this bore and C, from the program's NFPA table.
Figure 153 Fittings & Pipe Losses of the riser in a Hazen-Williams project: each fitting as an equivalent length for this bore and C, from the program's NFPA table.

The tees and elbows. Where the water turns, an Elbow or a Tee from the Equipment strip is placed on the node. In a Hazen-Williams project its window shows its NFPA equivalent length instead of a K factor, and the solver adds that length to the pipe the water turns into: the elbow at the foot of the riser, the elbow at RT into the cross main (3.00 m of 4 in.), the tees at CM3 and CM2 into lines 3 and 2 (2.40 m of 1-1/2 in. and 3.70 m of 2-1/2 in.), and the elbow at CM1 into line 1 (1.80 m). The run through a tee is given nothing, which is NFPA 13's rule.

The tee at CM2 on its Tee page: (1) the pipe the water comes in by, (2) the branch it turns into, (3) the NFPA equivalent lengths, worked out from the bore and C of each pipe. Override takes a length instead.
Figure 154 The tee at CM2 on its Tee page: (1) the pipe the water comes in by, (2) the branch it turns into, (3) the NFPA equivalent lengths, worked out from the bore and C of each pipe. Override takes a length instead.
The elbow at CM1: (1) its NFPA equivalent length, on the pipe the water turns into.
Figure 155 The elbow at CM1: (1) its NFPA equivalent length, on the pipe the water turns into.

The connection to the town main is node CITY, given a pressure. Any first guess will do: section 10.6 finds the pressure the design area needs.

10.6 Calculation procedure#

  1. Set the units, Hazen Williams and the isometric drawing mode as above, and draw the model of Figure 149.
  2. Give CITY a first pressure, 3 barg, and press Run.
  3. Find the most remote sprinkler: the one with the least overdesign. Here it is SP2-10, at the end of branch line 2.
  4. Open Adjust on the Tools page. The adjusted variable is the Pressure of CITY, the target the Pressure of SP2-10, the target value 1.476 barg: the pressure at which a K80 sprinkler discharges 97.2 L/min. Press Start, then Apply Solution.
  5. On the Reports page press Report, tick NFPA 13 / 15 calculation, type the water supply test and the hose allowance (Figure 157) and press Generate report.
Adjust: the pressure at the town main that leaves the most remote sprinkler exactly its required flow.
Figure 156 Adjust: the pressure at the town main that leaves the most remote sprinkler exactly its required flow.
The Report window of a Hazen-Williams project: (1) the NFPA calculation, offered and ticked; under it the water supply test - static pressure, residual pressure and its flow - and the hose allowance, kept with the project.
Figure 157 The Report window of a Hazen-Williams project: (1) the NFPA calculation, offered and ticked; under it the water supply test - static pressure, residual pressure and its flow - and the hose allowance, kept with the project.

10.7 Reference results#

Example 10 solved. Flows in L/min and nominal sizes on the pipes, pressures in barg at the nodes.
Figure 158 Example 10 solved. Flows in L/min and nominal sizes on the pipes, pressures in barg at the nodes.
The tables on the sheet: branch line 2, the most remote, and the Calculator's demand.
Figure 159 The tables on the sheet: branch line 2, the most remote, and the Calculator's demand.

Adjust settles at 3.834 barg at the town main. The system then takes 1282 L/min, and with the hose allowance 2232 L/min. The most remote sprinkler, SP2-10, discharges 97.19 L/min at 1.476 barg; the first open sprinkler of the same line discharges 117.4 L/min, 21 per cent over its requirement, because it stands nearer the feed.

The NFPA calculation of the report: its basis, the sprinklers with their pressure and flow, and every pipe with its flow, bore, C, length, the equivalent length of its fittings, the friction of a metre and the losses to friction and to elevation.
Figure 160 The NFPA calculation of the report: its basis, the sprinklers with their pressure and flow, and every pipe with its flow, bore, C, length, the equivalent length of its fittings, the friction of a metre and the losses to friction and to elevation.
The water supply against the demand on Q^1.85 paper, as NFPA 13 draws it: the supply's curve through the static and residual points, the demand, and the demand with the hose allowance.
Figure 161 The water supply against the demand on Q^1.85 paper, as NFPA 13 draws it: the supply's curve through the static and residual points, the demand, and the demand with the hose allowance.

10.8 Interpretation#

The 2.36 bar between the town main and the most remote sprinkler is spent as follows: 0.97 bar along branch line 2 from the cross main, 0.36 bar in the cross main, 0.15 bar to friction in the riser and its valves, 0.83 bar to lift the water 8.5 m, and 0.05 bar in the underground. The branch line takes the most: small pipe, carrying the whole of its line's flow.

The supply curve gives 4.94 barg at 2232 L/min, against the 3.83 barg needed: a margin of 1.11 bar. The town main is enough. Many authorities ask for a margin, often 0.5 bar (about 10 psi); this one has it.

Line 2 and not line 1 holds the most remote sprinkler, although line 1 is farther along the cross main: water reaches line 2 through a tee, whose NFPA length (3.70 m) is about twice that of the elbow into line 1 (1.80 m), and that outweighs the extra 4 m of 3 in. cross main. The program finds it from the results; it is not assumed.

10.9 What-if investigation#

NFPA 13 allows the calculation to be made with the velocity pressure: a sprinkler with flow passing on beyond it discharges by its normal pressure, Pn = Pt - Pv, where Pv is the velocity pressure in the pipe feeding it; the last sprinkler of a line still discharges by Pt. Tick Velocity pressure in Setting, Advanced, and run Adjust again.

The town main then needs 3.792 barg and the system takes 1260 L/min, against 3.834 barg and 1282 L/min by total pressure. The first open sprinkler of line 2 now discharges 115.9 L/min instead of 117.4. Taking the velocity pressure in gives a slightly smaller demand, because the sprinklers nearer the feed are no longer credited with pressure that is moving the water past them; the total pressure method is the conservative and the usual one.

10.10 Comparison#

The calculation can be checked by hand as NFPA 13 sets it out, starting at the most remote sprinkler and working back towards the supply: its flow from K√P, the friction of each pipe from p = 6.05 x 10^5 Q^1.85 / (C^1.85 d^4.87) bar/m with Q in L/min and d in mm, and each sprinkler upstream discharging at the pressure that leaves at its node.

Table 22 The last three sprinklers of line 2, by hand and by FlowMax
StepBy handFlowMax
SP2-10 : flow at 1.476 barg97.20 L/min97.19 L/min
B2-5, 1 in. (26.64 mm), 3 m, 97.20 L/min : friction0.140 bar0.140 bar
Pressure at S2-91.616 barg1.616 barg
SP2-9 : flow101.71 L/min101.70 L/min
B2-4, 1-1/4 in. (35.05 mm), 3 m, 198.9 L/min : friction0.139 bar0.139 bar
Pressure at S2-81.755 barg1.755 barg
SP2-8 : flow105.99 L/min105.98 L/min
B2-3, 1-1/2 in. (40.89 mm), 3 m : friction0.144 bar0.144 bar
Pressure at S2-71.899 barg1.899 barg

The two agree to the third decimal: the program's Hazen-Williams is NFPA's. The report's pipe table (Figure 160) is the same calculation for every pipe, with the fittings' equivalent length Le added to the length: Pf = p x (L + Le).

10.11 Engineering remarks#

10.12 Exercise#

Replace the twelve K80 sprinklers with K115 (K 8.0 in US units) and keep the density. What pressure does the most remote sprinkler need now, what does the town main have to give, and how much margin is left? Then change the pipe material to Black Steel (Dry Systems) for a dry pipe system and repeat.

Example 11 Deluge water spray on a horizontal drum, NFPA 15#

Project files 11_Deluge - horizontal drum, NFPA 15.flmx 11_Deluge - horizontal drum, restriction orifice.flmx

11.1 Objective#

To calculate a deluge water spray system to NFPA 15 drawn by hand on the isometric sheet: open nozzles on three headers round a vessel, the deluge valve outside the fire zone, fittings as equivalent lengths in each pipe's own list, Adjust to find the pressure the system needs where it leaves the fire main, and a restriction orifice - a PD element in its Orifice model, ISO 5167-2 - to suit the system to the higher pressure the main actually gives.

11.2 Engineering problem#

A horizontal drum, 3.0 m in diameter and 10.0 m long, its axis 4.0 m above grade, is to be given water spray exposure protection at 10.2 L/min/m² over its shell and heads: 108.4 m², 1106 L/min. Twelve K57 nozzles on three headers - two above the drum, north and south, one beneath it, four nozzles 2.5 m apart on each - must each discharge 92.1 L/min. The deluge valve stands at grade 15 m away, outside the fire zone, and the pipe beyond it is dry until it opens.

What pressure does the system need where it leaves the fire main, and what happens when the main, in the fire case of the plant, gives 7.0 barg there?

11.3 Model schematic#

Example 11 as designed, on the isometric sheet. The take-off TO, the deluge valve DV-1, the feed and the riser up the west head of the drum; at B0 the bottom header, at M the two upper headers. Names above and nominal sizes under the pipes, names and elevations at the nodes.
Figure 162 Example 11 as designed, on the isometric sheet. The take-off TO, the deluge valve DV-1, the feed and the riser up the west head of the drum; at B0 the bottom header, at M the two upper headers. Names above and nominal sizes under the pipes, names and elevations at the nodes.

11.4 Input data#

Table 23 Example 11, input data
ItemValueBasis
Fluid, units, frictionWater at 25 °C; L/min, barg, m; Hazen-Williams
PipeBlack steel (wet) C 120 to the deluge valve; galvanized C 120 beyond itNFPA 15
Drum3.0 m x 10.0 m, axis 4.0 m up, shell and heads 108.4 m²
Density10.2 L/min/m², 1106 L/min in allNFPA 15, exposure protection
Nozzles12 x K 57 L/min/√bar, 92.1 L/min each, at least 1.4 barNFPA 15
HeadersUpper two at 5.6 m, bottom one at 2.0 m; 2, 1-1/2, 1-1/4, 1 in.
Deluge valve4 in., Cv 200Assumed; the valve's listed loss on a project
Fire main at the take-off7.0 barg in the fire caseFrom the ring main calculation, {sec:e6}

11.5 Model set-up#

The project is set up as section 10.5: Hazen Williams, the isometric drawing mode, nozzles from the Spray element. The nozzles on the upper headers point down at the drum and those on the bottom header up; on the sheet only the direction of the tip differs.

A nozzle: (1) K 57, (2) the required flow, (3) the NFPA 15 minimum of 1.4 bar.
Figure 163 A nozzle: (1) K 57, (2) the required flow, (3) the NFPA 15 minimum of 1.4 bar.
The deluge valve: (1) a fixed valve, (2) its Cv.
Figure 164 The deluge valve: (1) a fixed valve, (2) its Cv.

Fittings in each pipe's own list. Example 10 put its tees and elbows on the sheet; here each pipe lists the fittings the water turns through on its way in, from Details Fittings in the pipe window: the tee off the main and the gate valve on TO-1, the elbow at the foot of the riser on R-1 (3.00 m), the tee into the bottom header on B-1 (3.00 m), the tee at M on H-N and H-S (3.00 m each), and the elbow into each upper header on N-1 and S-1 (1.50 m). Both ways give the same result; the list is the quicker where several fittings fall on one pipe, the sheet the clearer to read.

Fittings & Pipe Losses of H-S, the pipe from M to the south header.
Figure 165 Fittings & Pipe Losses of H-S, the pipe from M to the south header.

11.6 Calculation procedure#

  1. Draw the model of Figure 162 and give TO a first pressure, 5 barg.
  2. Press Run and find the nozzle with the least overdesign: SN-N4, at the far end of the south header.
  3. Open Adjust: adjusted variable the Pressure of TO, target the Pressure of SN-N4, target value 2.612 barg - the pressure at which K 57 gives 92.1 L/min, above NFPA 15's 1.4 bar. Press Start, then Apply Solution.
  4. Give TO the main's 7.0 barg and run again to see what the system would take.
  5. Open the second file: the spool beyond the deluge valve is replaced by RO-1, a PD element drawn as a flow element, in its Orifice model (Figure 170). Try bores until the most remote nozzle is just above its flow.
Adjust: the pressure at the take-off that leaves the most remote nozzle its flow.
Figure 166 Adjust: the pressure at the take-off that leaves the most remote nozzle its flow.

11.7 Reference results#

Example 11 at the pressure Adjust found. Flows in L/min and sizes on the pipes, pressures in barg at the nodes.
Figure 167 Example 11 at the pressure Adjust found. Flows in L/min and sizes on the pipes, pressures in barg at the nodes.
The tables on the sheet: the south header's nozzles and the Calculator.
Figure 168 The tables on the sheet: the south header's nozzles and the Calculator.

The system needs 4.00 barg at the take-off and then takes 1166 L/min, 5.5 per cent more than the 1106 L/min of the design density: the nozzles nearer the feed discharge more than they need. They range from 92.1 to 104.6 L/min. The deluge valve takes 0.16 bar.

The NFPA calculation of the report for Example 11.
Figure 169 The NFPA calculation of the report for Example 11.

11.8 Interpretation#

The most remote nozzle is at the far end of an upper header, 5.6 m up and farthest along the pipe. The bottom header, 3.6 m lower, has the lift on its side: its first nozzle gives 104.6 L/min against 92.1 at the end of the upper header. A deluge system cannot be balanced by its nozzles alone; it is sized so that the worst is right and the others are over.

At the main's 7.0 barg the same system would take 1581 L/min, 43 per cent over the design flow, the most remote nozzle giving 126.2 L/min. Water the plant's fire case did not count on is then drawn from the main, and the other users on it are left with less.

11.9 What-if investigation#

A restriction orifice beyond the deluge valve takes the pressure the system does not need. In the second file the spool is replaced by RO-1, a PD element whose Orifice model works out its loss by ISO 5167-2 from its bore, the bore of the pipe at its inlet and the pressure taps.

RO-1 in its Orifice model: (1) the model, (2) the bore.
Figure 170 RO-1 in its Orifice model: (1) the model, (2) the bore.

With the main at 7.0 barg, a bore of 40 mm in the 102.3 mm pipe (β 0.391) leaves the most remote nozzle SN-S4 with 94.5 L/min, and the system takes 1195 L/min. The orifice takes 2.82 bar.

RO-1 after the run: (1) the bore, (2) the pressure loss across it; its β and discharge coefficient beside.
Figure 171 RO-1 after the run: (1) the bore, (2) the pressure loss across it; its β and discharge coefficient beside.
The system with its restriction orifice, the main at 7.0 barg.
Figure 172 The system with its restriction orifice, the main at 7.0 barg.

11.10 Comparison#

The orifice's loss can be checked by hand from ISO 5167-2. The flow gives the differential pressure across the plate, Δp = ρ/2 (q √(1-β⁴) / (C π d²/4))², and the pressure lost to the line is the part of it not recovered downstream, Δϖ = Δp (√(1-β⁴(1-C²)) - Cβ²) / (√(1-β⁴(1-C²)) + Cβ²).

Table 24 The restriction orifice by hand and by FlowMax
QuantityBy handFlowMax
Flow1195 L/min1195 L/min
β = d / D0.3910.391
Discharge coefficient C0.600
Differential pressure Δp3.395 bar
Pressure loss Δϖ2.820 bar2.820 bar
Most remote nozzle SN-S4 : K √P94.5 L/min94.5 L/min

11.11 Engineering remarks#

11.12 Exercise#

Remove the bottom header's last nozzle and spread the duty over eleven nozzles (K 61). Find the pressure the system needs, the flow at the main's 7.0 barg, and the bore of the orifice that suits it.

Example 12 A fire pump and two standpipes, NFPA 20 and NFPA 14#

Project file 12_Fire pump and standpipes, NFPA 20 and 14.flmx

12.1 Objective#

To check a fire pump against NFPA 20's acceptance points and a standpipe system against NFPA 14's demand with one model: the pump on its curve, the cases of the flow test and the fire as a Sets scenario, the pump's net pressure as a Calculator formula, a pressure-reducing valve on the lowest hose valve, and Adjust to find how much the pump may wear before the top outlet is short.

12.2 Engineering problem#

An office building of eight storeys has two Class I standpipes, A and B, 6 in., one in each stair, with a 2-1/2 in. hose valve 1.2 m above each landing; the highest is 29.2 m up. NFPA 14 asks for 946 L/min (250 gpm) at each of the two highest outlets of the most remote standpipe and at the highest outlet of the other, with 6.9 bar (100 psi) left at the most remote, and no hose outlet above 12.1 bar (175 psi).

An electric fire pump rated 2839 L/min (750 gpm) at 10.3 bar (150 psi) draws from a tank at grade and has its test header outside the pump room. Does the pump meet NFPA 20 - no more than 140 per cent of its rated pressure at churn, at least 65 per cent at 150 per cent of its rated flow - does it meet the standpipe demand, and what does the lowest hose valve see?

12.3 Model schematic#

Example 12 on the isometric sheet: the tank, the fire pump FP-1, the test header TH, the header to the foot of each standpipe, and the hose valves A1, A7, A8 and B8. PRV-1 is the pressure-reducing valve of the first-floor hose valve, AH1 its outlet.
Figure 173 Example 12 on the isometric sheet: the tank, the fire pump FP-1, the test header TH, the header to the foot of each standpipe, and the hose valves A1, A7, A8 and B8. PRV-1 is the pressure-reducing valve of the first-floor hose valve, AH1 its outlet.

12.4 Input data#

Table 25 Example 12, input data
ItemValueBasis
Fluid, units, frictionWater at 25 °C; L/min, barg, m; Hazen-Williams, C 120NFPA 14
Fire pumpRated 2839 L/min at 10.3 bar (105.3 m); churn 120 %, 150 % flow at 68 %Assumed curve meeting NFPA 20
TankWater 3.0 m above its floor at grade
Header6 in.: 25 m to standpipe B, 40 m more to A
Standpipes6 in.; hose valves 1.2 m above each landing, 4 m apart; the highest 29.2 m up
Demand946 L/min at A8, A7 and B8; 6.9 bar left at A8NFPA 14
Hose outletsNo more than 12.1 bar; PRV-1 set at 6.9 barNFPA 14

12.5 Model set-up#

The pump is a Pump element on its curve, in Rating: the five points of Table 25 typed with Enter data. Its suction is the tank, a Tank element with its level; its discharge goes through a check valve and a gate valve, both in the fittings list of D-1.

The fire pump, its Specification on Rating - on its curve: (1) the points of the curve; the fitted head and efficiency drawn beside.
Figure 174 The fire pump, its Specification on Rating - on its curve: (1) the points of the curve; the fitted head and efficiency drawn beside.

The hose valves are nodes with a Flow In: 946 L/min leaving at A8, A7 and B8 as the file opens, and nothing at the test header. The pressure-reducing valve PRV-1 is a Valve with its Specification on Pressure set: it holds the pressure at the node chosen, here its own outlet AH1, at 6.9 barg. The hose valve behind it is shut (the valve's Status) until a case opens it.

PRV-1: (1) Pressure set, (2) the node it holds and the pressure.
Figure 175 PRV-1: (1) Pressure set, (2) the node it holds and the pressure.

The Calculator holds the pump's net pressure, the discharge PD less the suction PS, and that net pressure as a percentage of the rated 10.3 bar - NFPA 20's measure.

12.6 Calculation procedure#

  1. Draw the model of Figure 173 and press Run: the standpipe demand.
  2. Open Scenario, type Sets, with the inputs the Flow In at TH, A8, A7, B8 and AH1 and the Status of PRV-1, and as results the pump flow, the pressures at PD, A8 and A1 and the Calculator's percentage. Type the five cases of Table 26 and press Run.
  3. Open Adjust: adjusted variable the Relative speed of FP-1, target the Pressure of A8, value 6.9 barg. Press Start; do not apply it - it measures a margin.
Table 26 The five cases
CaseWhat it isTest headerA8, A7, B8Floor-1 hose valve
1Churn: the pump running against shut valves00shut
2Rated flow through the test header28390shut
3150 % of rated flow42590shut
4The standpipe demand0946 eachshut
5The first-floor hose valve alone00946, through PRV-1

12.7 Reference results#

The Scenario window's results for the five cases. Part 1 of 2; the first column is repeated.
Figure 176 The Scenario window's results for the five cases. Part 1 of 2; the first column is repeated.
The Scenario window's results for the five cases. Part 2 of 2; the first column is repeated.
Figure 177 The Scenario window's results for the five cases. Part 2 of 2; the first column is repeated.
The standpipe demand, as the file opens: flows in L/min on the pipes, pressures in barg at the nodes.
Figure 178 The standpipe demand, as the file opens: flows in L/min on the pipes, pressures in barg at the nodes.
Table 27 NFPA 20 and NFPA 14, checked
RequirementLimitFlowMax
Churn pressure, % of rated (NFPA 20)≤ 140120.0met
Rated flow, % of rated pressure100100.4
150 % flow, % of rated pressure (NFPA 20)≥ 6568.1met
Pressure left at A8 with the demand (NFPA 14)≥ 6.9 barg7.39 bargmet
Pressure at the first-floor hose valve, churn (NFPA 14)≤ 12.1 barg12.54 bargexceeded: a pressure-reducing valve

12.8 Interpretation#

At churn the pump gives 12.61 barg, 120.0 per cent of its rated net pressure; at 150 per cent of its rated flow, 68.1 per cent. Both are inside NFPA 20. With the standpipe demand the pump runs at 2838 L/min - its rated flow - and A8, the most remote outlet, is left with 7.39 barg, 0.49 bar above what NFPA 14 asks.

The lowest outlet sees the most. At churn, with nothing flowing, A1 is at 12.54 barg - the pump's churn pressure plus the tank's level, less 1.2 m - and that is above the 12.1 bar NFPA 14 allows at a hose outlet. In case 5 PRV-1 holds the outlet at 6.9 barg while A1 behind it stands at 12.35 barg.

12.9 What-if investigation#

A pump loses head as it wears. Adjust finds the speed - standing for a worn impeller - at which A8 is just at 6.9 barg with the standpipe demand: 0.981 of the rated speed. Head goes as the square of speed, so a pump that has lost 3.8 per cent of its head already leaves the building short of NFPA 14's pressure. That is a thin margin: a designer would choose a pump with more in hand, and the annual flow test of NFPA 25 is how the owner finds out before a fire does.

Adjust: the pump's relative speed that leaves A8 at 6.9 barg.
Figure 179 Adjust: the pump's relative speed that leaves A8 at 6.9 barg.

12.10 Comparison#

Two checks by hand. At churn nothing flows, so the pressure at A8 is the discharge pressure less the static head of the 28.7 m between them: 12.61 - 2.81 = 9.80 barg; FlowMax gives 9.80. With the standpipe demand the 6 in. pipe from the pump room header to A8 loses, by NFPA's formula, 0.137 bar in H-B, 0.118 bar in H-A, 0.054 bar up to A7 and 0.002 bar to A8, 0.312 bar in all; FlowMax's friction over the same path is 0.312 bar.

12.11 Engineering remarks#

12.12 Exercise#

The building is raised to twelve storeys, the highest hose valve 45.2 m up. Does the pump still meet the standpipe demand? If not, find with Adjust the rated pressure it would need, and say which floors then need pressure-reducing valves.

Verification checklist#

Every result quoted in the manual was produced by FlowMax while the manual was being assembled, from the project files delivered with it, and every figure is a FlowMax window or sheet painted from the same files. The items below are the things that were NOT verified against an outside source and should be confirmed before the manual is relied on for project work.

Table 28 Engineering data assumed for the examples
ExampleItemStatus
4Sizing limits 2.5 m/s and 0.004 bar/m; vessel pressure 3.0 barg; coil and chiller pressure dropsAssumed, typical of practice. Not from a project.
5Route elevations every 6 km; pump curves; throughput 400 m³/hInvented for the example.
6Hydrant, monitor and deluge demands; 7 barg minimum at the deluge valveAssumed. To be taken from the fire protection design basis.
7Density 10.2 L/min/m², nozzle K factors, the limits in the Design rules windowAs seeded in the program from NFPA 15. Confirm against the edition in force.
7Equivalent lengths of fittingsThe program's table in fitting_spray.txt, after NFPA 13. Not re-checked against the standard here.
8LNG properties from -165 to -150 °CAdded to the fluid library for this manual as typical lean LNG. Not from a composition.
8Stainless Steel roughness 0.015 mmAdded to the material library for this manual; a common handbook value.
9Pump curve and NPSH required curve; 0.6 m NPSH marginInvented for the example, of realistic shape.
10Ordinary Hazard Group 2, 8.1 mm/min over 139 m², K80 sprinklers, the town main's flow test, 950 L/min hose allowance; the alarm check valve as a swing check of the NFPA tableAssumed for the example. To be taken from the hazard classification, the listing and a witnessed flow test.
1110.2 L/min/m² on the drum, K57 nozzles, deluge valve Cv 200, 7.0 barg at the take-offAssumed. The valve's listed loss and the ring main calculation on a project.
12The fire pump's curve (churn 120 %, 68 % at 150 % flow); the building's heightsInvented to meet NFPA 20; not a vendor's curve.
allFitting K factorsThe program's library (fitting.txt). Typical values; not vendor data.
Table 29 Limits of what was checked
ItemStatus
Results against hand calculation or another programExamples 10 to 12 are checked by hand in their Comparison: NFPA 13's step by step, ISO 5167-2 for the orifice, static head. Examples 1 to 9 are self-consistent FlowMax results; the Liquid Validation report compares the program with published cases.
ScreensPainted by the program off screen at the size each window opens at, in the program's own look. Not photographs of a running session; a window may differ by a pixel or two in its frame.
Step-by-step instructionsWritten from the program's source and its windows. Each tool was driven through its own buttons to produce the results, but the steps were not walked through by a person at the keyboard.
ExercisesThe answers quoted in Examples 1 and 2 were worked with the program. The other exercises were checked to be solvable in outline only.
LicenceEvery model has 33 elements or fewer and was run with the Lite limit of 35 in force.
Table 30 Corrections made to FlowMax while preparing this revision, each with a regression test
What was wrongWhere it showed
Pump power was worked out from the previous run's efficiency; a pump that was off reported an infinite headExamples 2, 6, 9
A flow set point beyond the pump curve could return a nonsensical solved stateExample 8
Pipe sizing read rounded diameters and Apply wrote them, leaving the old outside diameterExample 4
Pipe sizing started with its limits set to Individual while showing All pipesExample 4
Calculator: after a run, var10 and above took the value of var1Example 6
Path graph: every point was plotted at the next pipe's lengthExamples 5, 8
Scenario and Adjust on fluid temperature stored library properties without converting units; in barg every NPSHa was 10 m lowExample 8
Nozzle Layout: inserted fittings were filed under the pipe's row, not its name, and were not written as equivalent lengths, so in Hazen-Williams they counted for nothingExample 7
A non-return valve held shut behind a stopped pump could be reported as an errorExample 9
Labels: NPSHa, Required flow and nozzle Pressure lacked a bracket; Adjust's table was titled Iteration Graph_pathScenario, Adjust, Calculator windows
Schedules 40, 80, STD, XS, 40S and 80S had no 1-1/4, 2-1/2, 3-1/2 or 5 in. size (revision 3)Examples 10, 11
The NFPA calculation of the report left the tees and elbows drawn on the sheet out of a pipe's Le, and its friction of a metre was over L alone (revision 3)Example 10
Table 31 Added to FlowMax for this revision - to be confirmed
AdditionWhy
A warning, NPSHa is lower than NPSHr, when a pump's curve carries NPSH required and the NPSH available is below it at the running flowThe solver already worked NPSHr out at the duty flow and nothing used it. Example 9 depends on it.
LNG in the fluid library; Stainless Steel and Copper Nickel 90-10 in the material librarySo that Example 8 uses library data.
Table 32 Noticed and left as it is
ObservationEffect
The text on the sheet is drawn at the zoom of the session, not of the drawing. A project opened after another, or saved while zoomed, shows its labels and tables at a different size relative to the pipes.Tables placed side by side can overlap after reopening. The examples were saved at 100 %.
NPSH required at the running flow is used for the warning but is not shown in the table of the selected element or the Links table.The reader takes it from the pump chart.
A scenario case or an Adjust step that cannot be solved shows the previous or an impossible value rather than a message.Examples 3 and 5 say how to recognise it.
Adjust takes a first step sized from the slope at the start; on a steep curve it can step outside what is solvable and report Failed.Choose a target that varies smoothly, as the examples do.
In the Nozzle Layout window at its opening size the Auto layout and Design rules buttons are partly hidden by the bottom bar.Cosmetic.
The Insert dialog describes a Grid as Branches tied at both ends, draws it with a main at each end and counts a looped main. What is inserted has one main, with each branch ending at its last nozzle.Example 7 describes what is inserted. The wording of the dialog is left for a decision.